Unit of competency Outline

Date retreived
22/07/2026 3:13 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Prepare and install architectural engineered glazing

Prepare and install architectural engineered glazing

Unit of competency
National Code
MSFGG3018
State Code
WI500
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
2.00
Current Release Date
10/09/2015
State Implementation and Classification
Approved Date
19/06/2014
Field of Education
040323 - Glazing
Original Release Date
19/06/2014
Nominal Hours
60
Description
This unit of competency covers preparing and installing glass in structural and other architectural engineered applications.Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking glass and glazing work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Notes
Elements and Performance Criteria
1 Identify work requirements
  • 1.1 Work requirements in the form of type of glass, frames and the method of fixing are identified from work instructions
  • 1.2 Work health and safety (WHS) requirements for fabrication and installation of architectural engineered glazing, including personal protective equipment, are identified and observed throughout the work
  • 1.3 The process for fabricating and installing architectural engineered glazing is identified
2 Prepare for work
  • 2.1 Work sequence is planned in a logical order to suit the job and workplace procedures
  • 2.2 Tools, equipment and materials, other than glass, acrylic glazing products and frames, are selected and checked prior to use to ensure they are appropriate for the work, serviceable and in a safe condition
  • 2.3 Type of glass and/or acrylic glazing products to be fitted and frames are selected to match the customer order, requirements for security, noise or light control and relevant Australian Standards
  • 2.4 Glass is checked for type, size and imperfections and the appropriate glass fixing method selected to meet specifications
  • 2.5 Ladders and scaffolding to comply with the relevant regulations and standards are identified and erected, where required, for the installation
  • 2.6 Frame or opening is prepared to receive glass
  • 2.7 Fixing and sealing materials are prepared by mixing or cutting to length, as appropriate
3 Identify site conditions and constraints
  • 3.1 Site safety hazards are recognised and corrective action taken to reduce injury to self and others
  • 3.2 Any on-site difficulties are identified and addressed in accordance with regulations and enterprise agreements
  • 3.3 Special characteristics of the glass aperture are identified in relation to the effect of the glass fitting process on the finished job
  • 3.4 Covering material is applied, where necessary, to protect existing fixtures and fittings
4 Fit glass
  • 4.1 Glass and/or acrylic glazing product is fixed to the frame or opening using the selected method and in accordance with recognised Australian and industry standards
  • 4.2 Solvents and sealants are used in accordance with manufacturer recommendations and Australian Standards
  • 4.3 Excess sealing material is removed and the glass and frame cleaned after fixing
5 Inspect final product and clean up work area
  • 5.1 Completed installation is checked to ensure compliance with customer requirements, specifications and Australian Standards
  • 5.2 Work area is cleaned and left in a safe condition and rubbish removed from work area and disposed of in accordance with relevant statutory requirements and enterprise requirements
  • 5.3 Any ladders or scaffolding used in the installation are disassembled and removed
  • 5.4 Tools, equipment and materials are cleaned and stored following workplace procedures
  • 5.5 Waste and scrap material are removed for disposal or recycling, as required
  • 5.6 Workplace documentation is completed in accordance with workplace requirements, including calculating the cost of glass, fittings, materials and labour
No information
No information
Replaces
State Code National Code Title Type
S7834 LMFGG3018C Prepare and install architectural engineered glazing Unit of competency
Replaced By
State Code National Code Title Type
OAJ07 MSFGG3037 Install structural glazing products Unit of competency
State Code National Code Title Type
J732 MSF30413 Certificate III in Glass and Glazing Qualification