Unit of competency Outline

Date retreived
22/07/2026 7:59 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Prepare and install architectural engineered glazing

Prepare and install architectural engineered glazing

Unit of competency
National Code
LMFGG3018C
State Code
S7834
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
04/10/2011
State Implementation and Classification
Approved Date
08/02/2012
Field of Education
040323 - Glazing
Original Release Date
08/02/2012
Nominal Hours
60
Description
This unit of competency covers the skills and knowledge required to prepare and install glass in structural and other architectural engineered applications.
Notes
Elements and Performance Criteria
1 Identify work requirements
  • 1.1 Work requirements in the form of type of glass, frames and the method of fixing are identified from work instructions
  • 1.2 Occupational health and safety (OHS) requirements for fabrication and installation of architectural engineered glazing, including personal protective equipment, are identified and observed throughout the work
  • 1.3 The process for fabricating and installing architectural engineered glazing is identified
2 Prepare for work
  • 2.1 Work sequence is planned in a logical order to suit the job and workplace procedures
  • 2.2 Tools, equipment and materials, other than glass, acrylic glazing products and frames, are selected and checked prior to use to ensure they are appropriate for the work, serviceable and in a safe condition
  • 2.3 Type of glass and/or acrylic glazing products to be fitted and frames are selected to match the customer order, requirements for security, noise or light control and relevant Australian Standards
  • 2.4 Glass is checked for type, size and imperfections and the appropriate glass fixing method selected to meet specifications
  • 2.5 Frame or opening is prepared to receive glass
  • 2.6 Fixing and sealing materials are prepared by mixing or cutting to length, as appropriate
3 Identify site conditions and restraints
  • 3.1 Site safety hazards are recognised and corrective action taken to reduce injury to self and others
  • 3.2 Any on-site difficulties are identified and addressed in accordance with regulations and enterprise agreements
  • 3.3 Special characteristics of the glass aperture are identified in relation to the effect of the glass fitting process on the finished job
  • 3.4 Covering material is applied, where necessary, to protect existing fixtures and fittings
4 Fit glass
  • 4.1 Glass and/or acrylic glazing product is fixed to the frame or opening using the selected method and in accordance with recognised Australian and industry standards
  • 4.2 Solvents and sealants are used in accordance with manufacturer recommendations and Australian Standards
  • 4.3 Excess sealing material is removed and the glass and frame cleaned after fixing
5 Inspect final product and clean up work area
  • 5.1 Completed installation is checked to ensure compliance with customer requirements, specifications and Australian Standards
  • 5.2 Work area is cleaned and left in a safe condition and rubbish removed from work area and disposed of in accordance with relevant statutory requirements and enterprise requirements
  • 5.3 Tools, equipment and materials are cleaned and stored following workplace procedures
  • 5.4 Waste and scrap material are removed for disposal or recycling, as required
  • 5.5 Workplace documentation is completed in accordance with workplace requirements
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Types of glass may include, but are not limited to:
annealed glass
toughened glass
laminated glass
wired glass
bandit resistant glass
bullet resistant glass
heat reflective glass
solar controlled glass and spandral panels
Methods of fixing depend upon:
the specification
type of glass and frame
security requirements
sealing methods
relevant Australian Standards
glazing methods:
beaded
pocket
flush
channel glazing and structural glazing
Personal protective equipment includes:
that prescribed under legislation, regulation and enterprise policies and practices, and may include:
gauntlets
gloves
safety glasses
hard hats
safety footwear
aprons and overalls
Fabricating and installing may include:
aluminium glazing systems, including planar assemblies, curtain wall systems, spider assemblies and panel wall systems (hung and stacked)
identifying and erecting appropriate ladders and scaffolding
Workplace procedures include:
workplace procedures relating to fitting of glass for structural applications
on-site procedures and regulations relating to the handling and movement of glass
equipment manufacturer specifications and operational procedures
work instructions, including job sheets, plans, drawings and designs
safety standards, including personal protective equipment, OHS regulations and enterprise requirements
Australian Standards:
AS 1288:2006 Glass in buildings - Selection and installation
AS/NZS 2208:1996 Safety glazing materials in buildings
AS/NZS 4667:2000 Quality requirements for cut-to-size and processed glass
AS 4285:2007 Skylights
AS/NZS 4666:2000 Insulating glass units
Tools and equipment may include:
general cutting and glazing tools
electric and pneumatic portable power tools
saws
drills and portable compressors
Materials may include, but are not limited to:
all forms of flat glass and acrylic glazing products
plastic
aluminium
steel
solid timber
gaskets
sealants and adhesives
Preparation includes:
cleaning
surface preparation (if required)
checking size against specification

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the language, literacy and numeracy capacity of the candidate and the work being performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Assessors must be satisfied that the candidate can competently and consistently:
interpret work order/job instruction and locate and apply relevant information to fabricate and install structural glazing
apply safe handling requirements for equipment, products and materials, including use of personal protective equipment
follow work instructions, operating procedures and inspection practices to:
minimise the risk of injury to self and others
prevent damage to goods, equipment and products
maintain required production output and product quality
as a minimum:
measure glass for curtain walls, balustrades, suspended and/or overhead glazing
select glass to comply with AS 1288:2006 Glass in buildings - Selection and installation
cut and process glass in accordance with AS/NZS 4667:2000 Quality requirements for cut-to-size and processed glass
identify and erect appropriate ladders and scaffolding to comply with the relevant regulations and standards
identify and apply glazing, structural sealants and tapes
install glazing materials and weatherproofing
calculate the cost of glass and labour
work effectively with others.
Context of and specific resources for assessment
The application of competency is to be assessed in the workplace or realistically simulated workplace.
Assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge, other than confirmatory questions, will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian Standard requirements.
The following resources should be made available:
frames
glass and acrylic glazing products
fixing material
sealants
workplace operating procedures and work orders
personal protective equipment
an appropriate work area/site.
Method of assessment
Assessment must satisfy the endorsed Assessment Guidelines of the LMF02 Furnishing Industry Training Package.
Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of underpinning knowledge.
Assessment methods must be by direct observation of tasks and include questioning on underpinning knowledge to ensure correct interpretation and application.
Assessment may be applied under project-related conditions (real or simulated) and require evidence of process.
Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances.
Assessment may be in conjunction with assessment of other units of competency.
Guidance information for assessment



Replaces
State Code National Code Title Type
W8692 LMFGG3018B Prepare and install architectural engineered glazing Unit of competency
Replaced By
State Code National Code Title Type
WI500 MSFGG3018 Prepare and install architectural engineered glazing Unit of competency
State Code National Code Title Type
D675 LMF30611 Certificate III in Glass and Glazing Qualification