Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Operate fluid flow equipment
Operate fluid flow equipment
Unit of competency
National Code
PMAOPS201B
PMAOPS201B
State Code
W8840
W8840
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
05/09/2013
Field of Education
030717 - Plant And Machine Operations
Original Release Date
05/09/2013
Nominal Hours
60
Description
This competency covers the operation of the range of pumps and valves typically encountered in the fluid flow system of a processing plant. It includes identifying, operating, monitoring and troubleshooting these items.
Notes
Elements and Performance Criteria
1. Prepare for work.
- 1.1. Identify work requirements
- 1.2. Identify and control hazards
- 1.3. Coordinate with appropriate personnel
2. Operate pumps.
- 2.1. Identify the type of pump
- 2.2. Start up and shut down pump as required
- 2.3. Adjust flow and head/pressure as appropriate to type of pump
- 2.4. Complete routine checks and reports taking action as required
- 2.5. Change over pumps as required.
3. Operate pump drivers.
- 3.1. Monitor critical variables such as amps, temperature and vibration
- 3.2. Keep critical variables in range
- 3.3. Recognise trends/patterns which indicate a potential or actual problem with the pump driver
- 3.4. Take action to ensure driver as required.
4. Operate valves.
- 4.1. Identify the type of valve
- 4.2. Operate valve in a manner appropriate to the valve type
- 4.3. Complete routine checks and reports, taking action as required.
5. Respond to fluid system problems.
- 5.1. Monitor fluid flow system frequently and critically throughout shift using measured/indicated data and senses (sight, hearing, etc) as appropriate
- 5.2. Recognise issues requiring action
- 5.3. Take appropriate action.
6. Isolate and de-isolate pump.
- 6.1. Isolate equipment
- 6.2. Make safe for required work
- 6.3. Check plant is ready to be returned to service
- 6.4. Prepare plant for return to service .
RANGE STATEMENT
The Range Statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the Performance Criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs if the candidate, accessibility of the item, and local industry and regional contexts.
Codes of practice/ standards
Where reference is made to industry codes of practice, and/or Australian/international standards, the latest version must be used.
Context
This competency is typically performed by all operators. It includes items of equipment such as:
pumps, including various types of centrifugal, positive displacement, acid egg
valves, such as globe, needle, gate, butterfly, plug cock, wedge plug, ball cock, non-return, diaphragm, pneumatic globe, pneumatic butterfly
piping systems and components, including bends and elbows, tee pieces, expansion mechanisms, pipe joints, reducers, nipples, orifices, in-line mixers, filters and strainers, flexible hoses and couplings
shaft seals, such as stuffing boxes, mechanical seals, fluid seals, labyrinth seals.
The effect of pipe fittings on pump performance and problems/problem analysis is also included.
All operations are performed to procedures.
Problems
Typical problems include:
cavitation
seal leaks
head loss/low flow
bearing problems.
Appropriate action
Appropriate action includes:
determining problems needing action
determining possible fault causes
rectifying problem using appropriate solution within area of responsibility
following through items initiated until final resolution has occurred
reporting problems outside area of responsibility to designated person.
Procedures
Procedures may be written, verbal, computer-based or in some other form. They include:
all work instructions
standard operating procedures
formulas/recipes
batch sheets
temporary instructions
any similar instructions provided for the smooth running of the plant.
For the purposes of this Training Package, 'procedures' also includes good operating practice as may be defined by industry codes of practice (eg Responsible Care) and government regulations.
Start up shut down as required
Start up shut down as required includes:
start up and shut down to/from normal operating conditions
start up and shut down to/from isolated, cold, empty
all other conditions experienced on the plant.
ie from any condition to any condition experienced on the plant.
Health, safety and environment (HSE)
All operations to which this unit applies are subject to stringent health, safety and environment requirements, which may be imposed through State or Federal legislation, and these must not be compromised at any time. Where there is an apparent conflict between Performance Criteria and HSE requirements, the HSE requirements take precedence.
The Range Statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the Performance Criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs if the candidate, accessibility of the item, and local industry and regional contexts.
Codes of practice/ standards
Where reference is made to industry codes of practice, and/or Australian/international standards, the latest version must be used.
Context
This competency is typically performed by all operators. It includes items of equipment such as:
pumps, including various types of centrifugal, positive displacement, acid egg
valves, such as globe, needle, gate, butterfly, plug cock, wedge plug, ball cock, non-return, diaphragm, pneumatic globe, pneumatic butterfly
piping systems and components, including bends and elbows, tee pieces, expansion mechanisms, pipe joints, reducers, nipples, orifices, in-line mixers, filters and strainers, flexible hoses and couplings
shaft seals, such as stuffing boxes, mechanical seals, fluid seals, labyrinth seals.
The effect of pipe fittings on pump performance and problems/problem analysis is also included.
All operations are performed to procedures.
Problems
Typical problems include:
cavitation
seal leaks
head loss/low flow
bearing problems.
Appropriate action
Appropriate action includes:
determining problems needing action
determining possible fault causes
rectifying problem using appropriate solution within area of responsibility
following through items initiated until final resolution has occurred
reporting problems outside area of responsibility to designated person.
Procedures
Procedures may be written, verbal, computer-based or in some other form. They include:
all work instructions
standard operating procedures
formulas/recipes
batch sheets
temporary instructions
any similar instructions provided for the smooth running of the plant.
For the purposes of this Training Package, 'procedures' also includes good operating practice as may be defined by industry codes of practice (eg Responsible Care) and government regulations.
Start up shut down as required
Start up shut down as required includes:
start up and shut down to/from normal operating conditions
start up and shut down to/from isolated, cold, empty
all other conditions experienced on the plant.
ie from any condition to any condition experienced on the plant.
Health, safety and environment (HSE)
All operations to which this unit applies are subject to stringent health, safety and environment requirements, which may be imposed through State or Federal legislation, and these must not be compromised at any time. Where there is an apparent conflict between Performance Criteria and HSE requirements, the HSE requirements take precedence.
EVIDENCE GUIDE
The Evidence Guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Assessment of this unit should include demonstrated competence on actual plant and equipment in a work environment. The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency. Assessment will occur over a range of situations which will include disruptions to normal, smooth operation.
Simulation may be required to allow for assessment of parts of this unit. Simulation should be based on the actual plant and will include walk-throughs of the relevant competency components. Simulations may also include the use of case studies/scenarios and role plays.
This unit of competency requires a significant body of knowledge which will be assessed through questioning and the use of what-if scenarios both on the plant (during demonstration of normal operations and walk throughs of abnormal operations) and off the plant.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective action. The emphasis should be on the ability to stay out of trouble rather than on recovery from a disaster.
Consistent performance should be demonstrated. In particular look to see that:
early warning signs of equipment/processes needing attention or with potential problems are recognised
the range of possible causes can be identified and analysed and the most likely cause determined
appropriate action is taken to ensure a timely return to full performance
obvious problems in related plant areas are recognised and an appropriate contribution made to their solution.
These aspects may be best assessed using a range of scenarios/case studies/what-ifs as the stimulus with a walk through forming part of the response. These assessment activities should include a range of problems, including new, unusual and improbable situations which may have been generated from the past incident history of the plant, incidents on similar plants around the world, hazard analysis activities and similar sources.
Context of and specific resources for assessment
Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations. A bank of scenarios/case studies/what-ifs will be required as will a bank of questions which will be used to probe the reasoning behind the observable actions.
Method of assessment
In all plants it may be appropriate to assess this unit concurrently with relevant teamwork and communication units. Consider co-assessment with units covering:
measurements and readings
housekeeping
communication.
In a major hazard facility, it may be appropriate to assess this unit concurrently with:
MSAPMOHS200A Work safely.
The assessment should cover at least one type of centrifugal pump and one type of positive displacement pump, as well as at least two different types of valves for the operator to be regarded as competent.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the assessee and the work being performed.
The Evidence Guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Assessment of this unit should include demonstrated competence on actual plant and equipment in a work environment. The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency. Assessment will occur over a range of situations which will include disruptions to normal, smooth operation.
Simulation may be required to allow for assessment of parts of this unit. Simulation should be based on the actual plant and will include walk-throughs of the relevant competency components. Simulations may also include the use of case studies/scenarios and role plays.
This unit of competency requires a significant body of knowledge which will be assessed through questioning and the use of what-if scenarios both on the plant (during demonstration of normal operations and walk throughs of abnormal operations) and off the plant.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective action. The emphasis should be on the ability to stay out of trouble rather than on recovery from a disaster.
Consistent performance should be demonstrated. In particular look to see that:
early warning signs of equipment/processes needing attention or with potential problems are recognised
the range of possible causes can be identified and analysed and the most likely cause determined
appropriate action is taken to ensure a timely return to full performance
obvious problems in related plant areas are recognised and an appropriate contribution made to their solution.
These aspects may be best assessed using a range of scenarios/case studies/what-ifs as the stimulus with a walk through forming part of the response. These assessment activities should include a range of problems, including new, unusual and improbable situations which may have been generated from the past incident history of the plant, incidents on similar plants around the world, hazard analysis activities and similar sources.
Context of and specific resources for assessment
Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations. A bank of scenarios/case studies/what-ifs will be required as will a bank of questions which will be used to probe the reasoning behind the observable actions.
Method of assessment
In all plants it may be appropriate to assess this unit concurrently with relevant teamwork and communication units. Consider co-assessment with units covering:
measurements and readings
housekeeping
communication.
In a major hazard facility, it may be appropriate to assess this unit concurrently with:
MSAPMOHS200A Work safely.
The assessment should cover at least one type of centrifugal pump and one type of positive displacement pump, as well as at least two different types of valves for the operator to be regarded as competent.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the assessee and the work being performed.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| C5937 | PMAOPS201A | Operate fluid flow equipment | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AXN52 | PMAOPS201 | Operate fluid flow equipment | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| AWW2 | DEF22215 | Certificate II in Explosive Ordnance Manufacture | Qualification |
| W515 | PMA20108 | Certificate II in Process Plant Operations | Qualification |
| J572 | PMA30113 | Certificate III in Process Plant Operations | Qualification |
| W516 | PMA30108 | Certificate III in Process Plant Operations | Qualification |
| J570 | PMA20113 | Certificate II in Process Plant Operations | Qualification |
| J571 | PMA40113 | Certificate IV in Process Plant Technology | Qualification |