Unit of competency Outline
Date retreived
22/07/2026 6:28 AM AWST
22/07/2026 6:28 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Coarse sand timber flooring
Coarse sand timber flooring
Unit of competency
National Code
MSFFL2015
MSFFL2015
State Code
WI345
WI345
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
19/06/2014
Field of Education
040321 - Floor Coverings
Original Release Date
19/06/2014
Nominal Hours
20
Description
This unit of competency covers coarse sanding of existing floors using a drum or belt driven sanding machine to grade the surface to remove cupping, ridges, high points or deep scratches usually involving three passes and the gradual overlapping of each run.Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Notes
Elements and Performance Criteria
1 Prepare for the work
- 1.1 Applicable work health and safety (WHS), legislative and organisational requirements relevant to coarse sanding of timber flooring are verified and complied with
- 1.2 Instructions and/or plans are read and interpreted to identify process required to complete work tasks
- 1.3 Timber flooring is checked for contamination and moisture content
- 1.4 Timber flooring condition is assessed and the extent of floor preparation required to meet job specifications is confirmed
- 1.5 Timber flooring is inspected for suitability for sanding operations and any pre-sanding tasks are completed
- 1.6 Mechanical fixings are removed avoiding damage to equipment and surfaces
- 1.7 Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
- 1.8 Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation
2 Conduct coarse sanding operations
- 2.1 Coarse sanding equipment is set up in accordance with manufacturer instructions and operating procedures
- 2.2 Emergency stops, gauges, guards and controls are identified and checked
- 2.3 Equipment settings and adjustments are made and checked
- 2.4 Trial runs are conducted to check machine operations and quality of finished work
- 2.5 Sanding belts or papers are attached, routinely checked and changed as required
- 2.6 Sanding is completed systematically and effectively within the minimum required timeframe
- 2.7 Routine lubrication and adjustments to the equipment are completed as required
- 2.8 Timber flooring is cleared and checked for further processing
3 Conduct edge sanding operations
- 3.1 Edge sanding equipment is set up in accordance with manufacturer instructions and operating procedures
- 3.2 Emergency stops, gauges, guards and controls are identified and checked
- 3.3 Equipment settings and adjustments are made and checked
- 3.4 Sanding papers are selected
- 3.5 Trial runs are conducted to check machine operations and quality of finished work
- 3.6 Sanding papers are attached, routinely checked and changed as required
- 3.7 Edge sanding is completed systematically and effectively within the minimum required timeframe
- 3.8 Routine lubrication and adjustments to the equipment are completed as required
- 3.9 Finished timber flooring is cleaned, inspected and any imperfections are rectified following workplace procedures
4 Complete housekeeping
- 4.1 Unused materials are stored or recycled as required
- 4.2 Tools and equipment are cleaned and stored appropriately
- 4.3 Work area is cleaned and rubbish disposed of appropriately
- 4.4 Workplace documentation is completed
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W8538 | LMFFL2111A | Coarse sand timber flooring | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAJ79 | MSFFL2045 | Coarse sand timber flooring | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J736 | MSF30813 | Certificate III in Flooring Technology | Qualification |
| J725 | MSF20113 | Certificate II in Furnishing | Qualification |