Unit of competency Outline

Date retreived
22/07/2026 10:22 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Facilitate the use of planning software systems in manufacturing

Facilitate the use of planning software systems in manufacturing

Unit of competency
National Code
MSACMT460A
State Code
W9008
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
01/12/2005
State Implementation and Classification
Approved Date
30/06/2011
Field of Education
030101 - Manufacturing Engineering
Original Release Date
30/06/2011
Nominal Hours
50
Description
This unit covers the knowledge and skills required by a team leader or technical expert to use and facilitate the use of planning software systems (known by various names such as ERP, SAP and MRP). This unit also covers the interactions of the person with a planning software system as they both use it for their own work and support their team members use it.
Notes
Elements and Performance Criteria
1. Communicate using the planning software system
  • 1.1. Send and receive information using planning software1.2. Send and receive messages using planning software
2. Make decisions using planning software
  • 2.1. Interrogate the planning software system to find required current, historical or predicted information2.2. Take actions appropriate to the information in accordance with procedures
3. Monitor the use of planning software
  • 3.1. Routinely monitor planning software information and use along the value chain3.2. Review performance and use of planning software with team
4. Support team use planning software
  • 4.1. Regularly communicate with team, both using planning software and face to face4.2. Identify improvements required4.3. Take appropriate actions to implement improvements
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Planning software
Planning software is a general term applied to a number of software systems which integrate a range of business information such as finance, logistics maintenance and production. It is frequently referred to by names such as ERP, SAP or MRP/MRPII. In some cases it can be integrated with engineering applications such as Systems Control and Data Acquisition (SCADA) systems. In such cases MSACMT261A Use SCADA systems in manufacturing may also be required.
Competitive manufacturing organisations encompass the entire production system, beginning with the customer, and includes the product sales outlet, the final assembler, product design, raw material mining and processing and all tiers of the value chain (sometimes called the supply chain). Any truly 'competitive' system is highly dependent on the demands of its customers and the reliability of its suppliers. No implementation of competitive manufacturing can reach its full potential without including the entire 'enterprise' in its planning.
Value chain
Competitive manufacturing organisations encompass the entire production system, beginning with the customer, and includes the product sales outlet, the final assembler, product design, raw material mining and processing and all tiers of the value chain (sometimes called the supply chain). Any truly 'competitive' system is highly dependent on the demands of its customers and the reliability of its suppliers. No implementation of competitive manufacturing can reach its full potential without including the entire 'enterprise' in its planning .
EVIDENCE GUIDE
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, the range statement and the assessment guidelines for this training package.

Overview of assessment requirements
The person will need to be able to demonstrate an ability to understand and apply planning software to a work location or area and send, receive and interpret process and production data for that area. They should also be able to assist others in the use of the planning software system. Software editing is not required for this unit but the ability to recognise and suggest application improvements is required

What critical aspects of evidence are required to demonstrate competency in this unit?

Evidence of competent use of planning software and also of assisting their team to use it effectively and efficiently.
In what context should assessment occur?

Assessment will need to occur on an organisation using planning software or simulation software.
Are there any other units which could or should be assessed with this unit or which relate directly to this unit?

This unit may be assessed concurrently with other relevant units.
This unit covers the intermediate skill levels in CM for planning software. MSACMT260A Use planning software systems in manufacturing and MSACMT660A Develop the application of enterprise systems in manufacturing cover the lowest and highest skill levels respectively.
MSACMT260A Use planning software systems in manufacturing is specified as a prerequisite, and should be applied to the person's own job.
What method of assessment should apply?

Assessors must be satisfied that the person can consistently perform the unit as a whole, as defined by the elements, performance criteria, skills and knowledge. A holistic approach should be taken to the assessment.
Assessors should gather sufficient, fair, valid, reliable, authentic and current evidence from a range of sources. Sources of evidence may include direct observation, reports from supervisors, peers and colleagues, project work, samples, organisation records and questioning. Assessment should not require language, literacy or numeracy skills beyond those required for the unit.
The assessee will have access to all techniques, procedures, information, resources and aids which would normally be available in the workplace.
The method of assessment should be discussed and agreed with the assessee prior to the commencement of the assessment.
What evidence is required for demonstration of consistent performance?

Evidence of routine use over an extended period should be available. Planning software systems will typically log all interactions with it. Interrogation of the planning software system will therefore provide evidence of the operator's use of it. Actions taken may also be accessible from the planning software system itself, or may need other evidence available from the process.
What are the specific resource requirements for this unit?

Access to an organisation using planning software.
Replaces
State Code National Code Title Type
W2590 MCMT460A Facilitate the use of planning software systems in manufacturing Unit of competency
Replaced By
State Code National Code Title Type
WD540 MSS404060A Facilitate the use of planning software systems in a work area or team Unit of competency