Unit of competency Outline

Date retreived
22/07/2026 1:33 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Set up and adjust advanced PID process control loops

Set up and adjust advanced PID process control loops

Unit of competency
National Code
UEEIC0030
State Code
OCB02
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
05/10/2020
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
12/07/2021
Nominal Hours
36
Description
This unit involves the skills and knowledge required to set up and adjust advanced proportional-integral-derivative (PID) process control loops.It includes working safely and to standards, following set-up and adjustment procedures, applying knowledge of process requirements, testing and reporting.Permits may be required for some work environments, such as confined spaces, working aloft, near live electrical apparatus and site rehabilitation. No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare to tune control loop with advanced functions
  • 1.1 Work health and safety (WHS)/occupational health and safety (OHS) processes and workplace procedures for a given work area are identified, obtained and applied
  • 1.2 WHS/OHS risk control measures and workplace procedures are followed in preparation for the work
  • 1.3 Safety hazards that have not previously been identified are noted and risk control measures implemented
  • 1.4 Relevant person/s is consulted to ensure work is coordinated effectively with others involved on the worksite
  • 1.5 Advanced control loop parameters are identified by reviewing process specifications and equipment instructions
  • 1.6 Tools, equipment and testing devices required for work are obtained in accordance with workplace procedures and checked for correct operation and safety
  • 1.7 Preparatory work is checked to ensure no damage has occurred and work is in accordance with relevant industry standards
  • 1.8 Need to inspect, test and measure live work is determined in accordance with WHS/OHS requirements and workplace procedures
  • 1.9 Circuits/machines/plant are inspected, tested and isolated in accordance with WHS/OHS requirements and workplace procedures
2 Tune control loop for advanced functions
  • 2.1 WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
  • 2.2 Testing/measuring devices are connected and set up in accordance with relevant industry standards and control system for advanced functions
  • 2.3 Control set-point is determined and control loop adjusted in accordance with relevant industry standards and process specifications
  • 2.4 Process is observed and decisions made in consultation with process operation personnel to readjust control loop settings to ensure process demand and output quality are met
  • 2.5 Process control loops are readjusted, as required, and checked
  • 2.6 Methods for dealing with unexpected situations are discussed with relevant person/s and documented
  • 2.7 Unplanned situations are dealt with safely and with the approval of relevant person/s in accordance with workplace procedures
  • 2.8 Quality inspection is conducted of process output to ensure control loop is tuned in accordance with workplace procedures
  • 2.9 Tuning is carried out efficiently without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy principles
3 Complete and report control loop tuning activities
  • 3.1 WHS/OHS risk control work completion measures and workplace procedures are followed
  • 3.2 Worksite is cleaned and made safe in accordance with workplace procedures
  • 3.3 Control loop settings are documented and relevant person/s notified in accordance with workplace procedures
No information
No information
Replaces
State Code National Code Title Type
WC626 UEENEEI110A Set up and adjust advanced PID process control loops Unit of competency