Unit of competency Outline

Date retreived
22/07/2026 8:01 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Integrate multiple data sources into interactive 3-D environments

Integrate multiple data sources into interactive 3-D environments

Unit of competency
National Code
ICTGAM524
State Code
AUT99
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
25/03/2015
State Implementation and Classification
Approved Date
16/09/2015
Field of Education
020115 - Computer Graphics
Original Release Date
16/09/2015
Nominal Hours
30
Description
This unit describes the skills and knowledge required to integrate multiple data sources into interactive 3-D environments.It applies to individuals with high-level technical and communication skills and may be applicable to concept artists, game designers, games programmers, animators and other personnel working in the game development industry.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Catalogue elements to integrate into the interactive 3-D environment
  • 1.1 Research and identify data sources that can be integrated into interactive 3-D environments
  • 1.2 Identify data sources that will be integrated to suit the environment, game design, game genre, game mechanics, game-play elements, and level specifications
  • 1.3 Obtain or create data sources for the interactive 3-D environment
2. Identify tools that can be used to integrate assets
  • 2.1 Identify tools and libraries for integration of identified elements into the 3-D environment
  • 2.2 Review and document how the tools work
3. Integrate sources into the interactive 3-D environment
  • 3.1 Create prototypes and integrate the elements into the interactive 3-D environment using the identified tools
  • 3.2 Test integration of the elements
  • 3.3 Ensure that the elements’ integrity during the implementation is maintained
4. Present and evaluate completed 3-D environment with all data sources included
  • 4.1 Present the interactive 3-D environment to the appropriate personnel
  • 4.2 Review the feedback from the presentation
  • 4.3 Evaluate and justify the implementation, using tools for the data sources
No information
No information
Replaces
State Code National Code Title Type
D7827 ICAGAM524A Integrate multiple data sources into interactive 3-D environments Unit of competency
Replaced By
State Code National Code Title Type
OBU48 ICTGAM550 Integrate multiple data sources into interactive 3-D environments Unit of competency