Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Manage glass processing plant shutdown and re-start

Manage glass processing plant shutdown and re-start

Unit of competency
National Code
MSFGG4007
State Code
WI510
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
10/12/2013
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
030717 - Plant And Machine Operations
Original Release Date
20/06/2014
Nominal Hours
35
Description
This unit of competency covers the coordination of the shutdown and re-starting of a glass production or processing plant in a safe and efficient manner due to a planned or an unplanned shutdown or emergency situation. It does not apply to individual plant operators shutting down individual production units or following directions during a shutdown and would typically be exercised by the leading plant technician on a shift. This unit requires the exercise of discretion as the plant technician's responses are governed by the cause of the shutdown and the plant's responses to that. It requires the coordination of all personnel involved in the shutdown to ensure it happens in as orderly a fashion as possible and that the plant is left in the best condition possible for a quick re-start. No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Manage shutdown sequence
  • 1.1 Glass plant safety systems are checked and verified to ensure that the unit has been made safe
  • 1.2 The reason for, or cause of, the plant shutdown is identified by troubleshooting the system and utilising all available data and information systems
  • 1.3 Confirmation of the identified shutdown is obtained from operators to verify both the nature and the reliability of the shutdown
  • 1.4 Procedures are initiated to rectify the fault or shutdown cause through either repair of the operational fault or readjustment before returning the system to start-up status
2 Conduct start-up process
  • 2.1 All start-up permissives are satisfied prior to start-up process being commenced
  • 2.2 Start-up is conducted according to procedures and in a safe and efficient manner, ensuring a return to normal operation is achieved
3 Document shutdown and start-up process
  • 3.1 All logs and workplace documentation relating to the shutdown/start-up process are completed ensuring all details, actions and responses are accurately recorded
  • 3.2 Any further ongoing production problems are recorded and reported to appropriate persons or authority
No information
No information
Replaced By
State Code National Code Title Type
OAI95 MSFGG4015 Manage glass processing plant shutdown and restart Unit of competency
State Code National Code Title Type
J750 MSF40413 Certificate IV in Glass and Glazing Qualification