Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Construct and install water distribution assets

Construct and install water distribution assets

Unit of competency
National Code
NWPNET031
State Code
AVY66
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
07/12/2015
State Implementation and Classification
Approved Date
15/04/2016
Field of Education
040327 - Plumbing
Original Release Date
15/04/2016
Nominal Hours
30
Description
This unit describes the skills required to construct and install water distribution assets.This unit applies to those working as field and operational staff with responsibility for ensuring that water distribution assets are constructed and installed in a safe and timely manner.The skills and knowledge described in this unit must be applied within the legislative, regulatory and policy environment in which they are carried out. Organisational policies and procedures must be consulted and adhered to, particularly those related to manufacturer specifications, environmental requirements, WHS, construction and disinfection. Those undertaking this unit would work independently or in a team using own familiar resources as required, while performing routine tasks in range of familiar contexts, ensuring minimum damage to the environment.No licensing, legislative or certification requirements apply to unit at the time of publication.
Notes
Elements and Performance Criteria
1. Plan and prepare for construction and installation
  • 1.1 Determine work requirements for construction and installation of water distribution system pipes and assets from plans, specifications and instructions.
  • 1.2 Perform site checks to prevent damage to other utilities.
  • 1.3 Select and check equipment and tools to meet safety and work requirements of task and site.
  • 1.4 Select, fit and use personal protective equipment.
2. Construct and install distribution assets, pipes and associated fittings
  • 2.1 Excavate and prepare trenches.
  • 2.2 Lay bedding or foundation.
  • 2.3 Inspect pipes and fittings, and lay or join them.
  • 2.4 Install or place prefabricated components.
  • 2.5 Backfill excavations according to specifications.
3. Confirm work quality
  • 3.1 Check constructed and installed distribution assets, pipes and fittings to ensure that specifications are met.
  • 3.2 Check water quality testing results to ensure that organisational requirements are met.
4. Finalise work
  • 4.1 Check, maintain and store equipment, tools and materials.
  • 4.2 Restore work site.
  • 4.3 Complete workplace records and as constructed drawings, and process as required.
No information
No information
Replaces
State Code National Code Title Type
D1854 NWP233B Construct and install water distribution assets Unit of competency
Replaced By
State Code National Code Title Type
OBN81 NWPNET049 Construct and install water distribution assets Unit of competency
State Code National Code Title Type
AYW4 NWP20115 Certificate II in Water Industry Operations Qualification