Unit of competency Outline

Date retreived
23/07/2026 11:51 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install and set up grid connected photovoltaic power systems

Install and set up grid connected photovoltaic power systems

Unit of competency
National Code
UEENEEK026A
State Code
W6398
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
08/11/2006
State Implementation and Classification
Approved Date
17/11/2009
Field of Education
031399 - Electrical And Electronic Engineering And Technology, N.e.c.
Original Release Date
17/11/2009
Nominal Hours
36
Description
Notes
Elements and Performance Criteria
No information
No information
No information
Replaced By
State Code National Code Title Type
W8164 UEENEEK026B Install and set up grid connected photovoltaic power systems Unit of competency
State Code National Code Title Type
W539 UEE42009 Certificate IV in Electrical - Photovoltaic Systems Qualification