Qualification Outline

Date retreived
22/07/2026 12:33 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Certificate IV in Electrical - Photovoltaic Systems

Certificate IV in Electrical - Photovoltaic Systems

Qualification
National Code:
UEE42009
State Code:
W539
TGA Status:
Replaced
DTWD Status:
Replaced
National Endorsed, State Implementation and Classification
Field of Education
0313 - Electrical And Electronic Engineering And Technology
Original TGA Release Date
12/08/2009
Approved Date
17/11/2009
Stream of Study
Initial Vocational (3100 - 3600)
VET Act Classifier
C
Nominal Hours
578
Duration
1 Semester
Current Release Number
1.00
Current Release Date
12/08/2009
VET Act Conditions
Releases
Release Version Release Date TGA Status DTWD Status
1.00 12/08/2009 Current Approved
Description
Schedule
Packaging Rules
The requirements for awarding this qualification are that the following are successfully achieved:
- All of the Core units;
- The required number of Stream Core units;
- The required number of Elective units as prescribed respective Schedule; and
- All the required prerequisite units have been met as required

Note: Those holding an 'Unrestricted Electricians Licence' or equivalent issued in an Australian State or Territory or those able to satisfy the ERAC requirements for the issue of an 'Unrestricted Electricians Licence', meet the requirements of the unit UEENEEG005B Verify compliance and functionality of general electrical installations and its prerequisite requirements
1. Core Units

All 8 units must be completed

State Code National Code Title Hours Type
W7826 UEENEEE024B Compile and produce an electrotechnology report 54 Unit of competency
W6647 UEENEEK035C Design grid connected power supply systems 108 Unit of competency
W7819 UEENEEE017B Implement and monitor OHS policies and procedures 18 Unit of competency
W9076 UEENEEG071C Install and set up interval metering 18 Unit of competency
W6645 UEENEEK048A Install, configure and commission grid connected photovoltaic power systems 54 Unit of competency
W7839 UEENEEE038B Participate in development and follow a personal competency development plan 18 Unit of competency
W6646 UEENEEK025C Solve basic problems in photovoltaic energy apparatus 72 Unit of competency
W7884 UEENEEG005B Verify compliance and functionality of general electrical installations 36 Unit of competency
2. Stream Core Units

At least three of the following units to be achieved

Note: all the required prerequisite units have been met as required

State Code National Code Title Hours Type
W7811 UEENEEE009B Comply with scheduled and preventative maintenance program processes 18 Unit of competency
W7740 UEENEEC010B Deliver a service to customers 18 Unit of competency
W8182 UEENEEK045A Implement and monitor, policies procedures for environmentally sustainable electrotech work practice 18 Unit of competency
W7731 UEENEEC001B Maintain documentation 18 Unit of competency
W8180 UEENEEK042A Participate in environmentally sustainable work practices 18 Unit of competency
W7822 UEENEEE020B Provide basic instruction in the use of electrotechnology apparatus 18 Unit of competency
W7733 UEENEEC003B Provide quotations for installation or service jobs 18 Unit of competency
W7732 UEENEEC002B Source and purchase material/parts for installation or service jobs 18 Unit of competency
W7759 UEENEED001B Use basic computer applications relevant to a workplace 18 Unit of competency
3. Elective Units

In accordance with Schedules 3 and 4, which forms an integral part of this qualification, achieve a Unit Strand Total of at least 8, of which at least 2 shall be selected from Schedule 4 as specified

Note:
- The following outlines ONE example of a training program for this qualification. Please refer to the Training Package for the full details of available units.
- Prerequisite pathways shall be identified and met for all elective units selected.
- In selecting elective units considerations to career planning advice should be given to units that form part of a prerequisite pathway for the progression to achieve particular competencies or qualification at a higher level.


State Code National Code Title Hours Type
W6396 UEENEEK024A Assemble and set up photovoltaic apparatus in domestic dwellings 18 Unit of competency
W6395 UEENEEK023A Carry out basic repairs to renewable energy apparatus by replacement of components 72 Unit of competency
W8149 UEENEEK010B Coordinate maintenance of renewable energy apparatus and systems 18 Unit of competency
W6398 UEENEEK026A Install and set up grid connected photovoltaic power systems 36 Unit of competency
Replaced By
State Code National Code Title Type
W853 UEE42010 Certificate IV in Electrical - Photovoltaic Systems Qualification
VET Info Notes
This training program is a representation of the qualification code UEE42009 taken from the Electrotechnology Training Package UEE07 which should be consulted for a full description of requirements.

1. This qualification is the copyright of Department of Education, Employment and Workplace Relations.

2. Further information on this qualification is available from ntis.gov.au.

3. This qualification was entered on to the STARS 17 Nov 2009 by the VET Teaaching and Learning Directorate.
Entry Requirements
No information
Traineeships and Apprenticeships
No information