Unit of competency Outline

Date retreived
22/07/2026 8:34 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install patterned and mosaic parquetry flooring

Install patterned and mosaic parquetry flooring

Unit of competency
National Code
MSFFL3083
State Code
OAJ45
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
03/12/2018
State Implementation and Classification
Approved Date
22/05/2019
Field of Education
040321 - Floor Coverings
Original Release Date
22/05/2019
Nominal Hours
60
Description
This unit describes the skills and knowledge required to prepare, set out, cut and install mosaic and panel parquetry in domestic and commercial sites. This unit applies to flooring technicians working in accordance with pre-determined work orders.Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Industry standards and codes of practice within Australia must also be applied. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Notes
Elements and Performance Criteria
1. Prepare for work
  • 1.1 Identify and follow work health and safety, legislative and organisational requirements
  • 1.2 Correctly identify work requirements and process from review of documentation
  • 1.3 Confirm subfloor suitability for installation consistent with Australian Standards and manufacturer recommendations
  • 1.4 Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  • 1.5 Remove or undercut skirting boards or cover trims, and store for re-fitting in accordance with work requirements
  • 1.6 Plan sequence of work, and starting point, to ensure efficiency and quality of installation
2. Set out mosaic parquetry flooring
  • 2.1 Inspect timber flooring material and confirm species, grade, size and quantity against work orders
  • 2.2 Moisture check timber using required equipment and confirm suitability of moisture content for site conditions as per pre-site inspection procedures
  • 2.3 Organise block parquetry flooring for fixing and use in accordance with safety management requirements
  • 2.4 Prepare required adhesives and edge strips in accordance with manufacturer instructions
  • 2.5 Accurately measure area to be covered and establish working lines and starting point
3. Lay out and cut parquetry mosaic fingers
  • 3.1 Follow instructions and sequence for laying and fixing
  • 3.2 Lay appropriate underlay in accordance with manufacturer recommendations
  • 3.3 Lay out block parquetry flooring to meet directional sequence, pattern match, specification requirements, minimising waste and joins
  • 3.4 Maximise the aesthetics of the materials, including matching grains and colours
  • 3.5 Accurately and clearly mark parquetry fingers or panels for cutting
  • 3.6 Cut parquetry fingers or panels to provide appropriate size and shape ensuring minimum waste
4. Install parquetry
  • 4.1 Use required adhesives and edge strips and/or accessories in accordance with manufacturer instructions
  • 4.2 Follow manufacturer recommendations for fixing methods and equipment
  • 4.3 Install and fix parquetry to produce required pattern
  • 4.4 Allow appropriate field and perimeter expansion joints
  • 4.5 Fit and/or re-fit skirting boards or cover trims and finish
  • 4.6 Inspect finished job and rectify any imperfections following workplace procedures
5. Complete housekeeping
  • 5.1 Store and recycle unused materials in accordance with workplace procedures
  • 5.2 Check, clean and store tools and equipment in accordance with workplace procedures
  • 5.3 Clean work area and dispose of rubbish safely
  • 5.4 Accurately complete required workplace documentation
No information
No information
Replaces
State Code National Code Title Type
WI393 MSFFL3036 Install mosaic parquetry flooring Unit of competency
Replaced By
State Code National Code Title Type
OEY55 MSFFL3117 Install mosaic and panel parquetry flooring Unit of competency
State Code National Code Title Type
BED0 MSF30818 Certificate III in Flooring Technology Qualification