Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Operate cryogenic processes

Operate cryogenic processes

Unit of competency
National Code
PMAOPS340
State Code
AXM95
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
02/06/2016
State Implementation and Classification
Approved Date
05/08/2016
Field of Education
030717 - Plant And Machine Operations
Original Release Date
05/08/2016
Nominal Hours
40
Description
This unit of competency covers the skills and knowledge required to operate and maintain a complex refrigeration/cryogenic system.This unit of competency includes all such items of equipment and unit operations which form part of the complex refrigeration/cryogenic system. A unit/system comprises two or more components of plant/equipment that are operated together to produce product, including as appropriate to the facility:large refrigeration systems that produce low temperatures multi-stage centrifugal compressorsheat exchangers computer controlmonitoring systems.This unit of competency applies to operations technicians who are required to demonstrate a significant understanding of the process and the equipment operation in order to identify and rectify operational problems, perform isolations, start-up and shutdown procedures, and operate, monitor and maintain equipment.This unit of competency applies to an individual operating independently in a plant with local control or in liaison with the control room operator in a plant with a centralised control panel, such as distributed control system (DCS) type controls. In the case of large complex plant, the operations technician would be part of a team during start-up and shutdown procedures. This unit of competency applies to an individual working alone or as part of a team or group and working in liaison with other shift team members and the control room operator, as appropriate.This competency does not require the operation of a central control panel. No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare for work
  • 1.1 Receive and give shift handover
  • 1.2 Identify work requirements
  • 1.3 Identify and control hazards
  • 1.4 Coordinate with appropriate personnel
  • 1.5 Check for recent work undertaken on cryogenic process
  • 1.6 Note any outstanding/incomplete work
  • 1.7 Check operational status of cryogenic process
2 Operate cryogenic process
  • 2.1 Describe the type of cryogenic plant, the component plant items and their duties
  • 2.2 Complete routine checks, logs and paperwork taking action on unexpected readings
  • 2.3 Change rate, grade or specification smoothly as required
  • 2.4 Adjust cryogenic process and its component plant items as appropriate to their type and duty to maximise performance
3 Diagnose and take action on abnormal situations in accordance with procedures
  • 3.1 Monitor cryogenic process and its component plant items frequently and critically throughout shift using measured/indicated data and senses as appropriate
  • 3.2 Recognise conditions likely to give rise to brittle fracture and take action required by procedures
  • 3.3 Identify critical exposure temperature (CET) and take action to minimise its impact
  • 3.4 Describe impacts of any changes upstream and downstream
  • 3.5 Recognise actual and developing situations which may require action
  • 3.6 Apply operational knowledge to resolve problems
  • 3.7 Take other actions on abnormal situations which cannot be resolved during the shift to ensure safety and the resolution of the situation
  • 3.8 Follow through items initiated until final resolution has occurred
4 Isolate and de-isolate plant
  • 4.1 Complete any required pre-start checks, including safety systems
  • 4.2 Start up/shut down cryogenic process according to the cryogenic plant type and duty in liaison with other personnel
  • 4.3 Monitor the start-up process and take action to ensure operating parameters are achieved
  • 4.4 Start up/shut down/changeover component plant items within unit according to their type and duty in liaison with other personnel
  • 4.5 Isolate entire cryogenic process and/or any component plant item
  • 4.6 Make safe for required work
  • 4.7 Check cryogenic process plant/plant item is ready to be returned to service
  • 4.8 De-isolate and prepare cryogenic process plant unit/plant item for return to service
No information
No information
Replaces
State Code National Code Title Type
W8885 PMAOPS340B Operate cryogenic processes Unit of competency
Replaced By
State Code National Code Title Type
OCK65 PMAOPS341 Operate and troubleshoot cryogenic processes Unit of competency