Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install on-site disposal systems
Install on-site disposal systems
Unit of competency
National Code
CPCPDR3023A
CPCPDR3023A
State Code
WF864
WF864
TGA Status
Replaced
Replaced
DTWD Status
Transition (Replaced)
Transition (Replaced)
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040327 - Plumbing
Original Release Date
20/06/2014
Nominal Hours
12
Description
This unit of competency specifies the outcomes required to install an on-site effluent disposal system from a domestic treatment plant.
Notes
Elements and Performance Criteria
1 Prepare for work.
- 1.1 Plans and specifications are obtained.
- 1.2 Work health and safety (WHS) and environmental requirements associated with the installation of on-site disposal systems areadhered to throughout the work.
- 1.3 Quality assurance requirements are identified and adhered to according to workplace requirements.
- 1.4 Tasks are planned and sequenced in conjunction with others involved in or affected by the work.
- 1.5 Tools and equipment, including personal protective equipment, are selected and checked for serviceability.
- 1.6 Work area is prepared to support efficient installation of the on-site disposal system.
2 Identify work requirements.
- 2.1 Position of on-site disposal system is determined according to plans, specifications, authorities' requirements and relevant Australian standards.
- 2.2 Quantity and type of materials required are calculated from design drawings and specifications in compliance with relevant Australian standards and local authorities' requirements.
- 2.3 Materials are identified, ordered and collected according to workplace procedures.
- 2.4 Materials are checked for compliance with docket and order form, and for acceptable condition.
3 Install on-site disposal system.
- 3.1 Set out is checked for compliance with plans, specifications and authorities' requirements.
- 3.2 Underground services within excavation area are identified and marked.
- 3.3 Site is excavated according to requirements for system, plans, permits and site requirements, ensuring minimum damage to surrounding structures or environment.
- 3.4 On-site effluent disposalsystem is installed according to plans, specifications, relevant Australian standards and regulatory requirements.
- 3.5 Sustainability principles and concepts are applied throughout the installation process.
- 3.6 System is checked for compliance with relevant Australian standards and regulatory authorities' requirements and correct operation.
4 Clean up.
- 4.1 Excavation is backfilled to specifications, work area is cleared and materials disposed of, reused or recycled according to legislation, regulations, codes of practice and job specification.
- 4.2 Tools and equipment are cleaned, checked, maintained and stored according to manufacturer recommendations and workplace procedures.
- 4.3 Informationis accessed and documentation completed according to responsible authority and workplace requirements.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Work health and safety is to be according to commonwealth, state and territory legislation and regulations and may include:
handling of materials
hazard control
hazardous materials and substances
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including recognising and preventing hazards associated with:
electricity
excavation and installation tools and equipment
hazardous materials
other machines
recently filled trenches
services
surrounding structure and facilities
traffic control
trip hazards
work site visitors and the public
working in proximity to others
use of firefighting equipment
use of first aid equipment
workplace environment and safety.
Environmental requirements cover water quality management and may include:
clean-up protection
stormwater protection
waste management.
Quality assurance requirements may include:
environment policy
Environment Protection Authority (EPA)
internal company quality assurance policy and risk management strategy
International Standards Organisation
site safety plan
workplace operations and procedures.
Tools and equipment may include:
hand and power tools
levelling equipment
manual and mechanical excavation equipment
measuring equipment.
Materials may include:
aggregates
geotextiles or other approved materials
perforated pipes
piping
sprinklers and fittings.
On-site effluent disposal may include:
absorption
absorption and transpiration
absorption and transpiration bed
domestic treatment plants, including domestic treatment plant or simulated receptacle
mound system
irrigation system.
Sustainability principles and concepts:
cover the social, economic and environmental use of resources to meet current and future needs
may include:
efficient energy and water use
efficient use and recycling of material
correct handling of hazardous materials
disposing waste material to ensure minimal environmental impact
selecting appropriate components to ensure minimal environmental impact.
Information may include:
charts and hand drawings
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions
material safety data sheets (MSDS)
memos
organisation work specifications and requirements
plans and sketches
regulatory and legislative requirements, particularly those pertaining to:
building codes
WHS and environmental requirements
plumbing regulations
relevant Australian standards
safe work procedures relating to installing on-site disposal systems
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Work health and safety is to be according to commonwealth, state and territory legislation and regulations and may include:
handling of materials
hazard control
hazardous materials and substances
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including recognising and preventing hazards associated with:
electricity
excavation and installation tools and equipment
hazardous materials
other machines
recently filled trenches
services
surrounding structure and facilities
traffic control
trip hazards
work site visitors and the public
working in proximity to others
use of firefighting equipment
use of first aid equipment
workplace environment and safety.
Environmental requirements cover water quality management and may include:
clean-up protection
stormwater protection
waste management.
Quality assurance requirements may include:
environment policy
Environment Protection Authority (EPA)
internal company quality assurance policy and risk management strategy
International Standards Organisation
site safety plan
workplace operations and procedures.
Tools and equipment may include:
hand and power tools
levelling equipment
manual and mechanical excavation equipment
measuring equipment.
Materials may include:
aggregates
geotextiles or other approved materials
perforated pipes
piping
sprinklers and fittings.
On-site effluent disposal may include:
absorption
absorption and transpiration
absorption and transpiration bed
domestic treatment plants, including domestic treatment plant or simulated receptacle
mound system
irrigation system.
Sustainability principles and concepts:
cover the social, economic and environmental use of resources to meet current and future needs
may include:
efficient energy and water use
efficient use and recycling of material
correct handling of hazardous materials
disposing waste material to ensure minimal environmental impact
selecting appropriate components to ensure minimal environmental impact.
Information may include:
charts and hand drawings
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions
material safety data sheets (MSDS)
memos
organisation work specifications and requirements
plans and sketches
regulatory and legislative requirements, particularly those pertaining to:
building codes
WHS and environmental requirements
plumbing regulations
relevant Australian standards
safe work procedures relating to installing on-site disposal systems
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
locating, interpreting and applying relevant information, Australian standards and specifications to install on-site disposal systems
applying safety requirements throughout the work sequence, including electrical safety requirements and the use of personal protective clothing and equipment
given the plans and specifications, determining the requirements for installing:
a transpiration or an absorption trench, with the trench being at least three metres in length, running from a distribution pit or outlet of a domestic treatment plant; or a surface or sub-surface irrigation on-site disposal system, ensuring:
application of sustainability principles and concepts throughout the installation of on-site disposal systems
correct identification of location, design and details of proposed installation
correct selection and use of appropriate processes, tools and equipment
completing all work to specification
compliance with regulations, relevant Australian standards and organisational quality procedures and processes
communicating and working effectively and safely with others.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the minimum task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry-related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
locating, interpreting and applying relevant information, Australian standards and specifications to install on-site disposal systems
applying safety requirements throughout the work sequence, including electrical safety requirements and the use of personal protective clothing and equipment
given the plans and specifications, determining the requirements for installing:
a transpiration or an absorption trench, with the trench being at least three metres in length, running from a distribution pit or outlet of a domestic treatment plant; or a surface or sub-surface irrigation on-site disposal system, ensuring:
application of sustainability principles and concepts throughout the installation of on-site disposal systems
correct identification of location, design and details of proposed installation
correct selection and use of appropriate processes, tools and equipment
completing all work to specification
compliance with regulations, relevant Australian standards and organisational quality procedures and processes
communicating and working effectively and safely with others.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the minimum task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry-related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D7430 | CPCPDR3013A | Install on-site disposal systems | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCO47 | CPCPDR3023 | Install on-site domestic wastewater treatment plants and disposal systems | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J484 | CPC20712 | Certificate II in Drainage | Qualification |
| J787 | CPC32413 | Certificate III in Plumbing | Qualification |
| J491 | CPC32412 | Certificate III in Plumbing | Qualification |
| J788 | CPC32513 | Certificate III in Plumbing (Mechanical Services) | Qualification |