Unit of competency Outline

Date retreived
22/07/2026 7:06 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Licence to operate a boom-type elevating work platform (boom length 11 metres or more)

Licence to operate a boom-type elevating work platform (boom length 11 metres or more)

Unit of competency
National Code
TLILIC2005A
State Code
D5243
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
2.00
Current Release Date
24/12/2013
State Implementation and Classification
Approved Date
29/10/2014
Field of Education
030717 - Plant And Machine Operations
Original Release Date
29/10/2014
Nominal Hours
30
Description
This unit specifies the outcomes required to operate a boom-type elevating work platform (boom length 11 metres or more) for licensing purposes, and involves the operation of a telescoping device, hinged device, or articulated device or any combination of these used to support a platform on which personnel, equipment and materials may be elevated to perform work. The 11 metre boom length shall be taken to mean the greater of the following:(a) The vertical distance from the floor of the platform to the surface supporting the elevating work platform with the platform at its maximum height; or (b) The nominal reach, measured horizontally from the centre point of rotation to the outer edge of the platform in its most extended position.
Notes
Elements and Performance Criteria
1 Plan work
  • 1.1 Potential workplace hazards are identified
  • 1.2 Hazard control measures are identified consistent with appropriate standards to ensure the safety of personnel and equipment
  • 1.3 Elevating work platform is appropriate for the task
  • 1.4 Appropriate communication methods are identified
2 Conduct routine checks
  • 2.1 Service logbook for elevating work platform is checked for compliance
  • 2.2 Elevating work platform is visually checked for any defects or damage according to procedures
  • 2.3 Routine pre-operational checks are carried out according to procedures
  • 2.4 Safety equipment is inspected according to procedures
  • 2.5 Elevating work platform is accessed in a safe manner
  • 2.6 Fit safety equipment and secure to platform according to procedures
  • 2.7 All controls are located and identified
  • 2.8 Elevating work platform is started according to procedures
  • 2.9 All safety devices are identified and tested according to procedures
  • 2.10 Post-start operational checks are carried out according to procedures
  • 2.11 All communication equipment is checked (where applicable)
  • 2.12 All defects and damage are reported and recorded in according to procedures, and appropriate action is taken
3 Set up elevating work platform
  • 3.1 Ground suitability is inspected and checked
  • 3.2 Elevating work platform is driven to or located at work area according to procedures (where applicable)
  • 3.3 Elevating work platform is positioned for work application and stability according to procedures
  • 3.4 Appropriate hazard prevention/control measures are applied to the work area according to procedures
  • 3.5 Work gear and tools are stowed and secured
4 Operate elevating work platform
  • 4.1 Elevating work platform is operated using all relevant plant movements according to procedures and the appropriate standards
  • 4.2 Elevating work platform is mobiled using best mobile practice and appropriate procedures
  • 4.3 Elevated working platform operations are monitored constantly ensuring safety of personnel and stability
  • 4.4 Unplanned and/or unsafe situations are responded to in line with procedures
5 Shut down and secure elevating work platform
  • 5.1 Elevating work platform is lowered and stowed according to procedures
  • 5.2 All relevant motion locks and brakes are applied (where applicable)
  • 5.3 Safety equipment is disconnected from platform
  • 5.4 Egress from elevated work platform is conducted according to procedures
  • 5.5 Outriggers/stabilisers are stowed and secured according to procedures (where applicable)
  • 5.6 Plates or packing are stowed and secured (where applicable)
  • 5.7 Elevating work platform is shut down according to procedures
  • 5.8 Routine post-operational checks are carried out according to procedures
  • 5.9 All defects and damage are reported and recorded according to procedures, and appropriate action is taken
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance.
Hazards may include:
ground stability (e.g. ground condition, recently filled trenches, slopes)
overhead hazards (e.g. powerlines, service pipes, trees, buildings etc.)
insufficient lighting
traffic (e.g. pedestrians, vehicles, plant)
environmental conditions (e.g. wind, lightning, storms, etc.)
other specific hazards (e.g. tidal areas, chainsaws, pressure washers, dangerous materials
Hazard control measures may include:
Refers to the systematic process of eliminating or reducing the risk to personnel and property through the application of controls
It includes the application of the hierarchy of control - the six-step preference of control measures to manage and control risk:
1. elimination
2. substitution
3. isolation
4. engineering control measures
5. using safe work practices
6. personal protective equipment
Appropriate standards may include:
codes of practice
legislation
Australian Standards
manufacturer's specifications
industry standards (where applicable)
Elevating work platformmay include:
The operation of a telescoping device, hinged device, or articulated device or any combination of these used to support a platform on which personnel, equipment and materials may be elevated to perform work. Excluded from this definition are platforms of less than 11 metres boom length.
The 11 metre boom length shall be taken to mean the greater of the following:
(a) The vertical distance from the floor of the platform to the surface supporting the elevating work platform with the platform at its maximum height; or
(b) The nominal reach, measured horizontally from the centre point of rotation to the outer edge of the platform in its most extended position
Communication method may include:
verbal and non-verbal language
written instructions
signage
hand signals
listening
questioning to confirm understanding
appropriate worksite protocol
Service logbook may include:
any logbook
service book
history record system where the service and maintenance history is kept
Procedures may include:
manufacturer's guidelines (instructions, specifications, operators manual or checklists)
industry operating procedures
workplace procedures (work instructions, operating procedures, checklists)
Safety equipment may include:
safety harness
energy absorber
lanyard
anchor points
Safety devices may include:
horns/sirens
audible and visual reversing devices
operator restraint devices (platform gate)
lights (where applicable)
Communication equipment may include:
two-way radios
mobile phone
Ground suitability may include:
rough uneven ground
backfilled ground
soft soils
hard compacted soil
rock
bitumen
concrete
Stability may include:
deploying outriggers
establishing correct size plates or packing
correctly positioning plates or packing
Hazard prevention/control measures may include:
safety tags on electrical switches/isolators
insulated powerlines
safety observer used inside exclusion zone
disconnected power
traffic barricades and controls
illumination requirements
pedestrian controls
trench covers
movement of obstructions
personal protective equipment
suitable area for set-up
suitable firm and stable standing
Relevant plant movements may include:
raising boom
lowering boom
slewing
hinging
articulating
telescoping
Best mobile practice may include:
minimum speed
gentle acceleration and braking
minimum boom/jib length
avoiding ground depressions
Unplanned and/or unsafe situationsmay include:
loss of power
failure of controls
contact with overhead electrical conductors
damage caused by contact with obstructions
illness of personnel
Shut down may include:
retracting boom/jib (where applicable)
folding boom/jib into the transport position
retracting outriggers/stabilisers
idling engine to stabilise temperature
turning off engine (where applicable)
removing key from ignition (where applicable)
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required knowledge and skills, the range statement and the assessment guidelines for this Training Package.
Overview of assessment
Successful assessment of this unit meets the competency requirement of the National Standard for Licensing Persons Performing High Risk Work.
State/territory OH&S regulators have mandated the use of Assessment Instruments and Instructions for Assessment for this unit which have been endorsed by the national body responsible for OH&S matters.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Compliance with OH&S licensing legislation.
Emergency procedures and safety equipment, including the use of safety harnesses, energy absorbers, lanyard and anchor points.
Assessment of ground conditions to confirm that the site is suitable (e.g. firm, level and safe) to extend and travel the elevating work platform.
Risk assessment and hazard control strategies, including hierarchy of control as applied to the positioning and safe operation of the elevating work platform (particular awareness of the risks associated with overhead powerlines/electrical cables, ground conditions, wind, pedestrians and tipping).
Appropriate procedures for estimation of loads, to ensure that the elevating work platform is not overloaded.
Positioning and operation of the elevating work platform to ensure that the safest lift is performed.
Context of and specific resources for assessment
Assessment of the safe and effective application of knowledge and skill to workplace tasks (performance) must be undertaken using the endorsed Assessment Instrument.
Assessment of performance must be undertaken either in the workplace or in a realistically simulated workplace.
Assessors must ensure that the assessment in the workplace is organised to ensure that all the required equipment and materials and a suitable working area is made available to suit the assessment and the workplace.
Assessment must occur under standard and authorised work practices, safety requirements and environmental constraints.
Assessment is to comply with relevant appropriate standard requirements.
Applicants must have access to:
Personal Protective Equipment (PPE) for the purpose of the Performance Assessment
appropriate safety equipment in safe condition
appropriate elevated working platform and associated equipment in safe condition
communication equipment (e.g. two-way radios, mobile phones etc.) where applicable.
Method of assessment
Assessment must be conducted using the endorsed Assessment Instruments. These Instruments provide advice on their application.
The use of 'simulators' in the assessment of this unit of competency is not acceptable.
Assessment may be in conjunction with the assessment of other units of competency.
Assessment methods must confirm consistency and accuracy of performance together with application of underpinning knowledge.
Assessment must confirm a reasonable inference that competency is not only able to be satisfied under the particular circumstances, but is able to be transferred to other circumstances.
Guidance information for assessment
Further information about endorsed Assessment Instruments may be obtained from state/territory OH&S regulators.
Replaces
State Code National Code Title Type
S7167 TLILIC508A Licence to operate a boom-type elevating work platform (boom length 11 meters or more) Unit of competency
Replaced By
State Code National Code Title Type
AWL71 TLILIC2005 Licence to operate a boom-type elevating work platform (boom length 11 metres or more) Unit of competency
State Code National Code Title Type
D474 AHC30810 Certificate III in Arboriculture Qualification
AZF8 RII20715 Certificate II in Civil Construction Qualification
J640 RII20713 Certificate II in Civil Construction Qualification
AZG2 RII30815 Certificate III in Civil Construction Plant Operations Qualification
J664 RII30813 Certificate III in Civil Construction Plant Operations Qualification
AZE0 RII31215 Certificate III in Civil Foundations Qualification
J634 RII31213 Certificate III in Civil Foundations Qualification
J496 CPC32912 Certificate III in Construction Crane Operations Qualification
J785 CPC30413 Certificate III in Demolition Qualification
J167 UET40412 Certificate IV in ESI - Network Systems Qualification
J165 UET30812 Certificate III in ESI - Power Systems - Distribution Cable Jointing Qualification
J163 UET30612 Certificate III in ESI - Power Systems - Distribution Overhead Qualification
J164 UET30712 Certificate III in ESI - Power Systems - Rail Traction Qualification
J162 UET30512 Certificate III in ESI - Power Systems - Transmission Overhead Qualification
J160 UET20312 Certificate II in ESI - Powerline Vegetation Control Qualification
J166 UET30912 Certificate III in ESI - Remote Community Utilities Worker Qualification
J251 UEP20112 Certificate II in ESI Generation - Operations Support Qualification
J256 UEP40412 Certificate IV in ESI Generation Maintenance (Fabrication) Qualification
J257 UEP40312 Certificate IV in ESI Generation Maintenance (Mechanical) Qualification
AC597 CUASS00024 Festivals and Events Skill Set Skill set
AZM4 CUA30415 Certificate III in Live Production and Services Qualification
J696 CUA30413 Certificate III in Live Production and Services Qualification
AZO0 CUA40415 Certificate IV in Live Production and Technical Services Qualification
AZK8 CUA50415 Diploma of Live Production and Technical Services Qualification
W939 TLI41910 Certificate IV in Mobile Crane Operations Qualification
W926 TLI31710 Certificate III in Mobile Crane Operations Qualification
J602 ICT30713 Certificate III in National Broadband Network Construction Qualification
J600 ICT20613 Certificate II in National Broadband Network Construction Qualification
J804 TLI33513 Certificate III in Stevedoring Qualification
J532 TLI21413 Certificate II in Stevedoring Qualification
J656 RII30113 Certificate III in Surface Extraction Operations Qualification
AZE5 RII30115 Certificate III in Surface Extraction Operations Qualification
J136 UET20412 Certificate II in Transmission Structure and Line Assembly Qualification
AZG1 RII31615 Certificate III in Trenchless Technology Qualification
J682 RII31613 Certificate III in Trenchless Technology Qualification
J689 RII20313 Certificate II in Underground Coal Mining Qualification
AZB8 RII20315 Certificate II in Underground Coal Mining Qualification