Unit of competency Outline
Date retreived
22/07/2026 6:08 PM AWST
22/07/2026 6:08 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install irrigation pumps
Install irrigation pumps
Unit of competency
National Code
AHCIRG309
AHCIRG309
State Code
BAO98
BAO98
TGA Status
Replaced
Replaced
DTWD Status
Transition (Replaced)
Transition (Replaced)
State Implementation and Classification
Approved Date
12/01/2017
Field of Education
059999 - Agriculture, Environmental And Related Studies, N.e.c.
Original Release Date
12/01/2017
Nominal Hours
45
Description
This unit of competency describes the skills and knowledge required to install and commission irrigation pumps.It applies to individuals who take responsibility for own work and for the quality of the work of others. They use discretion and judgement in the selection, allocation and use of available resources. All work is carried out to comply with workplace procedures.No occupational licensing, legislative or certification requirements are known to apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Plan and sequence installation tasks from instructions
- 1.1 Obtain drawings and specifications
- 1.2 Plan and sequence tasks
- 1.3 Select tools and equipment and check for serviceability
2. Source irrigation system requirements
- 2.1 Determine location of pump
- 2.2 Identify pump base requirements
- 2.3 Identify, order and collect materials and equipment
- 2.4 Check materials and equipment for acceptable condition and compliance
3. Install and commission pumping and flow control components
- 3.1 Set out and construct pump base
- 3.2 Install pump and pump controls
- 3.3 Connect suction and discharge lines and flow control devices
- 3.4 Connect delivery and distribution components to pump
- 3.5 Conduct pressure testing of pumping system
- 3.6 Test pump
4. Complete work
- 4.1 Clear work area and dispose of, reuse or recycle materials
- 4.2 Clean, check, maintain and store tools and equipment
- 4.3 Restore work site to meet environmental requirements
- 4.4 Complete documentation
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WE015 | AHCIRG309A | Interpret and apply instructions to install pumps | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OBJ88 | AHCIRG340 | Install irrigation pumps | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BCV7 | AHC32416 | Certificate III in Irrigation | Qualification |