Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install irrigation pumps

Install irrigation pumps

Unit of competency
National Code
AHCIRG340
State Code
OBJ88
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
21/10/2019
State Implementation and Classification
Approved Date
28/01/2020
Field of Education
059999 - Agriculture, Environmental And Related Studies, N.e.c.
Original Release Date
28/01/2020
Nominal Hours
45
Description
This unit of competency describes the skills and knowledge required to plan and sequence installation tasks, source, install and commission pump and flow control components, and complete irrigation pump installation.The unit applies to individuals who install irrigation pumps under broad direction and take responsibility for their own work.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Plan and sequence installation tasks from instructions
  • 1.1 Obtain drawings and specifications
  • 1.2 Plan and sequence tasks
  • 1.3 Select required tools and equipment and check for safe operation
2. Source irrigation system requirements
  • 2.1 Select, fit and use appropriate PPE2.2 Determine location of pump
  • 2.3 Identify pump base requirements
  • 2.4 Identify, order and collect materials and equipment
  • 2.5 Check materials and equipment for acceptable condition and compliance
3. Install and commission pumping and flow control components
  • 3.1 Set out and construct pump base
  • 3.2 Install pump and pump controls
  • 3.3 Connect suction and discharge lines and flow control devices
  • 3.4 Connect delivery and distribution components to pump
  • 3.5 Conduct pressure testing of pumping system
  • 3.6 Adjust and set flow control devices
  • 3.7 Test pump
4. Complete work
  • 4.1 Clear work area and dispose of, reuse or recycle materials
  • 4.2 Clean, check, maintain and store tools and equipment
  • 4.3 Restore work site to meet environmental requirements
  • 4.4 Complete documentation
No information
No information
Replaces
State Code National Code Title Type
BAO98 AHCIRG309 Install irrigation pumps Unit of competency