Unit of competency Outline

Date retreived
22/07/2026 8:18 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Design and size stormwater drainage systems

Design and size stormwater drainage systems

Unit of competency
National Code
CPCPDR4012B
State Code
WF866
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
07/02/2013
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
030907 - Water And Sanitary Engineering
Original Release Date
20/06/2014
Nominal Hours
32
Description
This unit of competency specifies the outcomes required to design, size and document the layout of surface and sub-soil stormwater drainage systems up to legal points of discharge.It covers the preparation for the planning, identification and confirmation of system specifications and requirements, the planning of the system layout and work finalisation processes, including records and documentation.
Notes
Elements and Performance Criteria
1 Prepare for planning.
  • 1.1 Nature and scope of the planning task are identified and confirmed.
  • 1.2 Work health and safety (WHS) and environmental requirements associated with installation of stormwater drainage systems are adhered to throughout the work.
  • 1.3 Work is organised and sequenced in conjunction with others involved in or affected by the work.
  • 1.4 Tools and equipment required for planning, sizing and documenting the layout of stormwater drainage systems, including personal protective equipment, are selected and checked for serviceability.
  • 1.5 Work area in which planning process is to be conducted is prepared.
2 Identify system requirements.
  • 2.1 Information and specifications for required work are obtained and confirmed, if necessary by site inspection.
  • 2.2 Regulations and Australian standards relevant to the work are consulted and applied to all aspects of the work.
  • 2.3 Design criteria are determined from relevant Australian standards and proposed method of installation.
  • 2.4 Stormwater catchment and flow requirements are identified.
  • 2.5 Stormwater pipe size is determined to conform to regulatory authorities’ main or street kerb and relevant Australian standards.
  • 2.6 Stormwater retention pit size, silt and flotation arrestor pit size, rainwater tank size and stormwater overflow discharge locations are determined to suit job requirements.
  • 2.7 System type is selected to suit collection and disposal requirements.
  • 2.8 Sustainability principles and concepts are observed when preparing for and undertaking work process.
3 Design system layout.
  • 3.1 Layout of stormwater drainage system is planned according to plans, specifications, relevant Australian standards and workplace procedures.
  • 3.2 Stormwater disposal system is specified according to job requirements.
  • 3.3 Materials required are specified and optimised from proposed design according to relevant Australian standards.
  • 3.4 Plans are recorded according to statutory and regulatory authorities’and workplace requirements.
4 Restore work area.
  • 4.1 Work area is restored according to workplace procedures.
  • 4.2 Tools and equipment used in the process are refurbished and left according to workplace procedures.
  • 4.3 Information is accessed and documentation, including work backup, is completed according to workplace requirements.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Work health and safety is to be according to commonwealth, state and territory legislation and regulations and may include:
handling of materials
hazard control
hazardous materials and substances
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including recognising and preventing hazards associated with:
electricity
other machines
surrounding structure and facilities
trip hazards
underground services
use of tools and equipment
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
use of firefighting equipment
use of first aid equipment
workplace environment and safety.

Environmental requirements cover water quality management and may include:
clean-up protection
stormwater protection
waste management.

Stormwater drainage systems will:
be gravity, pumped and displacement operated
terminate at point of connection with external stormwater drainage network, including:
disposal pit
easement
gutter
on-site storage tank
stormwater drain
sub-soil disposal system.

Tools and equipment may include:
CAD software
drawing instruments
ladders
laser measuring devices
measuring equipment.

Information relating to stormwater disposal plans may include:
authority mains or kerb
charts and hand drawings
instructions issued by authorised organisational or external personnel
job drawings
manufacturer specifications and instructions
material safety data sheets (MSDS)
maximum discharge rates allowed
memos
plans and sketches
organisation work specifications and requirements
possible locations of stormwater components
regulatory and legislative requirements, particularly those pertaining to:
National Construction Code
WHS and environmental requirements
plumbing regulations
relevant Australian standards, including AS/NZS3500 National plumbing and drainage: Part 3 Stormwater drainage
safe work procedures relating to planning, sizing and documenting the layout of stormwater drainage systems
signage
site relative levels
stormwater flow rates
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.

Sustainability principles and concepts:
cover the social, economic and environmental use of resources to meet current and future needs
may include:
correctly handling hazardous materials
disposing of waste material to ensure minimal environmental impact
harvesting rainwater
incorporating efficient use of material into the design, including recycling material
preventing environmental contamination
using efficient design principles throughout to minimal environmental impact
using energy and water efficiently.

Materials may include:
drafting and drawing materials
relevant plans and specifications.

Statutory and regulatory authorities include:
commonwealth, state or territory, and local authorities administering application Acts, regulations and codes of practice.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
locating, interpreting and applying relevant information, Australian standards and specifications to planning, sizing and documenting the layout of a stormwater drainage system
applying safety requirements throughout the work sequence, including electrical safety requirements and the use of personal protective clothing and equipment
given the development plans and specification, designing, sizing and documenting the layout details of a surface and sub-soil stormwater drainage system for a residential unit development comprising at least five two-storey (Class 1) units; and a commercial (Class 6) building, which includes drainage to the legal point of discharge to the external stormwater drainage network, ensuring:
application of sustainability principles and concepts
correct identification of plan details
correct selection and use of appropriate processes, tools and equipment
completion of all work to specification
compliance with regulations, relevant Australian standards and organisational quality procedures and processes
communicating and working effectively and safely with others.

Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards’ requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the minimum task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry-related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person’s demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
State Code National Code Title Type
D7432 CPCPDR4012A Design and size stormwater drainage systems Unit of competency
Replaced By
State Code National Code Title Type
OCN04 CPCPDR4012 Design and size stormwater drainage systems Unit of competency
State Code National Code Title Type
J499 CPC50612 Diploma of Hydraulic Services Design Qualification
J497 CPC40912 Certificate IV in Plumbing and Services Qualification