Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Design and size stormwater drainage systems

Design and size stormwater drainage systems

Unit of competency
National Code
CPCPDR4012A
State Code
D7432
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
19/05/2011
State Implementation and Classification
Approved Date
11/10/2011
Field of Education
040327 - Plumbing
Original Release Date
11/10/2011
Nominal Hours
32
Description
This unit of competency specifies the outcomes required to design, size and document the layout of surface and sub-soil stormwater drainage systems up to legal points of discharge.It covers the preparation for the planning, identification and confirmation of system specifications and requirements, the planning of the system layout and work finalisation processes, including records and documentation.
Notes
Elements and Performance Criteria
1. Prepare for planning.
  • 1.1. Nature and scope of the planning task are identified and confirmed.1.2. Safety (OHS) requirements associated with installation of stormwater drainage systems and workplace environmental requirements are adhered to throughout the work.1.3. Work is organised and sequenced in conjunction with others involved in or affected by the work.1.4. Tools and equipment required for planning, sizing and documenting the layout of stormwater drainage systems, including personal protective equipment, are selected and checked for serviceability.1.5. Work area in which planning process is to be conducted is prepared.
2. Identify system requirements.
  • 2.1. Information and specifications for required work are obtained and confirmed, if necessary by site inspection.2.2. Regulations and relevant Australian standards relevant to the work are consulted and applied to all aspects of the work.2.3. Design criteria are determined from relevant Australian standards and proposed method of installation.2.4. Stormwater catchment and flow requirements are identified.2.5. Stormwater pipe size is determined to conform to regulatory authorities' main or street kerb and relevant Australian standards.2.6. Stormwater retention pit size, silt and flotation arrestor pit size, rainwater tank size and stormwater overflow discharge locations are determined to suit job requirements.2.7. System type is selected to suit collection and disposal requirements.2.8. Sustainability principles and concepts are applied to work preparation and application.
3. Design system layout.
  • 3.1. Layout of stormwater drainage system is planned in accordance with plans, specifications, relevant Australian standards, and workplace procedures.3.2. Stormwater disposal system is specified in accordance with job requirements.3.3. Materials required are specified and optimised from proposed design according to relevant Australian standards.3.4. Plans are recorded in accordance with statutory and regulatory authorities' and workplace requirements.
4. Restore work area.
  • 4.1. Work area is restored in accordance with workplace procedures.4.2. Tools and equipment used in the process are refurbished and left in accordance with workplace procedures.4.3. Information is accessed and documentation, including work backup, is completed in accordance with workplace requirements.
No information
No information
Replaces
State Code National Code Title Type
W9663 CPCPDR4002A Plan, size and lay out stormwater drainage systems Unit of competency
Replaced By
State Code National Code Title Type
WF866 CPCPDR4012B Design and size stormwater drainage systems Unit of competency
State Code National Code Title Type
D417 CPC40911 Certificate IV in Plumbing and Services Qualification