Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Comply with scheduled and preventative maintenance program processes
Comply with scheduled and preventative maintenance program processes
Unit of competency
National Code
UEECD0011
UEECD0011
State Code
OBX53
OBX53
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
12/07/2021
Nominal Hours
18
Description
This unit involves the skills and knowledge required to comply with the quality assurance and risk management processes for scheduled and preventative maintenance of the electrotechnology aspects of plant and equipment. It includes working safely and to technical, quality and risk management standards, work specifications and maintenance schedules; sampling inspections; evaluating components and completing the necessary maintenance documentation.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare to comply with scheduled maintenance program process
- 1.1 Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and applied
- 1.2 Hazards are identified, risks assessed and control measures implemented
- 1.3 Maintenance schedule and process compliance requirements are confirmed with relevant person/s and work appropriately sequenced in accordance with workplace procedures
- 1.4 Relevant person/s is consulted to ensure the work is coordinated effectively with others involved on the work site
- 1.5 Location of equipment to be maintained is determined from maintenance schedule and/or system specifications and diagrams
- 1.6 Resources required to conduct the maintenance are obtained in accordance with workplace procedures and checked against job requirements
- 1.7 Tools, equipment and testing devices required to conduct the maintenance are obtained and checked for correct operation and safety in accordance with workplace procedures
2 Comply with scheduled maintenance program process
- 2.1 WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
- 2.2 Inspecting, testing or measuring on live and operating systems is conducted in accordance with WHS/OHS requirements and workplace procedures
- 2.3 Circuits/machines/plant are checked and isolated as required in accordance with WHS/OHS requirements and workplace procedures
- 2.4 Apparatus/components to be maintained are inspected and evaluated for compliance in accordance with maintenance schedule and operational and WHS/OHS requirements and workplace procedures
- 2.5 Non-compliant apparatus/components are documented and arrangements made for rectification in accordance with workplace procedures
- 2.6 Methods for dealing with unplanned situations are discussed with relevant person/s and documented in accordance with workplace procedures
- 2.7 Quality checks of the maintenance are undertaken in accordance with workplace procedures
- 2.8 Maintenance process compliance is carried out efficiently without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices
3 Complete maintenance compliance process
- 3.1 WHS/OHS risk control measures and workplace procedures for work completion are followed
- 3.2 Work site and equipment are cleaned and made safe in accordance with WHS/OHS requirements and workplace procedures
- 3.3 Final checks are made to verify that maintenance complies with WHS/OHS requirements, manufacturer specifications and workplace procedures
- 3.4 Maintenance completion is documented and relevant person/s notified in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W7811 | UEENEEE009B | Comply with scheduled and preventative maintenance program processes | Unit of competency |