Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Assemble and dismantle boom or jib
Assemble and dismantle boom or jib
Unit of competency
National Code
TLIB1707C
TLIB1707C
State Code
S5576
S5576
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
25/11/2010
Field of Education
030717 - Plant And Machine Operations
Original Release Date
25/11/2010
Nominal Hours
80
Description
Notes
Elements and Performance Criteria
No information
Operations may be conducted:
day or night
in a variety of weather conditions
Environment may include:
movement of equipment, goods, materials and vehicular traffic
Customers may be:
internal or external
Mobile crane may be any lattice boom mobile crane involved in work in a range of industry sectors including:
construction and demolition
manufacturing
waterfront
mining
primary industry
utilities (electricity, gas, water)
arboricultural
swimming pool
quarrying
Hazards may include:
power lines
noise, light, energy sources
overhead service lines
surrounding buildings, structures, facilities
underground services
obstructions
uneven or unstable ground and recently filled trenches
stationary and moving machinery and equipment
hazardous or dangerous materials
traffic hazards and congestion
other vehicles and personnel
Hazard management is:
consistent with the principle of hierarchy of control with elimination, substitution, isolation and engineering control measures being selected before safe working practices and personal protective equipment
Consultative processes may involve:
other employees and supervisors
management
union representatives
clients
industrial relations and OH&S specialists
other professional or technical staff
Requirements for assembly may include:
site restrictions and procedures
authorities and permits
hours of operation
slings, chains, nets, brackets and other specialised lifting equipment
personal protective equipment
support trucks
Personal protective equipment may include:
gloves
safety headwear and footwear
sunscreen, sunglasses and safety glasses
two-way radios
high visibility clothing
Depending on the type of organisation concerned and the local terminology used, workplace procedures may include:
company procedures
enterprise procedures
organisational procedures
established procedures
Documentation/information may include:
Safe Working Load (SWL) and Working Load Limit (WLL)
operations manuals including load charts and crane and rigging manuals
induction documentation
competency standards and training materials
job specifications and procedures
manufacturers specifications
workplace operating procedures and policies
supplier and/or client instructions
communications technology equipment, oral, aural or signed communications
personal and work area work procedures and practices
conditions of service, legislation and industrial agreements including:
workplace agreements and awards
occupational health & safety procedures
standards and certification requirements
quality assurance procedures
emergency procedures
Applicable regulations and legislation may include:
relevant state/territory regulations and licence/permit requirements pertaining to the assembly of mobile cranes
relevant state/territory OH&S legislation
relevant state/territory environmental protection legislation
day or night
in a variety of weather conditions
Environment may include:
movement of equipment, goods, materials and vehicular traffic
Customers may be:
internal or external
Mobile crane may be any lattice boom mobile crane involved in work in a range of industry sectors including:
construction and demolition
manufacturing
waterfront
mining
primary industry
utilities (electricity, gas, water)
arboricultural
swimming pool
quarrying
Hazards may include:
power lines
noise, light, energy sources
overhead service lines
surrounding buildings, structures, facilities
underground services
obstructions
uneven or unstable ground and recently filled trenches
stationary and moving machinery and equipment
hazardous or dangerous materials
traffic hazards and congestion
other vehicles and personnel
Hazard management is:
consistent with the principle of hierarchy of control with elimination, substitution, isolation and engineering control measures being selected before safe working practices and personal protective equipment
Consultative processes may involve:
other employees and supervisors
management
union representatives
clients
industrial relations and OH&S specialists
other professional or technical staff
Requirements for assembly may include:
site restrictions and procedures
authorities and permits
hours of operation
slings, chains, nets, brackets and other specialised lifting equipment
personal protective equipment
support trucks
Personal protective equipment may include:
gloves
safety headwear and footwear
sunscreen, sunglasses and safety glasses
two-way radios
high visibility clothing
Depending on the type of organisation concerned and the local terminology used, workplace procedures may include:
company procedures
enterprise procedures
organisational procedures
established procedures
Documentation/information may include:
Safe Working Load (SWL) and Working Load Limit (WLL)
operations manuals including load charts and crane and rigging manuals
induction documentation
competency standards and training materials
job specifications and procedures
manufacturers specifications
workplace operating procedures and policies
supplier and/or client instructions
communications technology equipment, oral, aural or signed communications
personal and work area work procedures and practices
conditions of service, legislation and industrial agreements including:
workplace agreements and awards
occupational health & safety procedures
standards and certification requirements
quality assurance procedures
emergency procedures
Applicable regulations and legislation may include:
relevant state/territory regulations and licence/permit requirements pertaining to the assembly of mobile cranes
relevant state/territory OH&S legislation
relevant state/territory environmental protection legislation
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria of this unit and include demonstration of applying:
the underpinning knowledge and skills
relevant legislation and workplace procedures
other relevant aspects of the range statement
Context of, and specific resources for assessment
Performance is demonstrated consistently over a period of time and in a suitable range of contexts
Resources for assessment include:
a range of relevant exercises, case studies and other simulated practical and knowledge assessment, and/or
access to an appropriate range of relevant operational situations in the workplace
In both real and simulated environments, access is required to:
relevant and appropriate materials and/or equipment, and/or
applicable documentation including workplace procedures, regulations, codes of practice and operation manuals
Method of assessment
Assessment of this unit must be undertaken by a registered training organisation
As a minimum, assessment of knowledge must be conducted through appropriate written/oral tests
Practical assessment must occur:
through appropriately simulated activities at the registered training organisation, and/or
in an appropriate range of situations in the workplace
The evidence required to demonstrate competency in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria of this unit and include demonstration of applying:
the underpinning knowledge and skills
relevant legislation and workplace procedures
other relevant aspects of the range statement
Context of, and specific resources for assessment
Performance is demonstrated consistently over a period of time and in a suitable range of contexts
Resources for assessment include:
a range of relevant exercises, case studies and other simulated practical and knowledge assessment, and/or
access to an appropriate range of relevant operational situations in the workplace
In both real and simulated environments, access is required to:
relevant and appropriate materials and/or equipment, and/or
applicable documentation including workplace procedures, regulations, codes of practice and operation manuals
Method of assessment
Assessment of this unit must be undertaken by a registered training organisation
As a minimum, assessment of knowledge must be conducted through appropriate written/oral tests
Practical assessment must occur:
through appropriately simulated activities at the registered training organisation, and/or
in an appropriate range of situations in the workplace
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| S2307 | TDTB1798B | Assemble and dismantle boom or jib | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| D4979 | TLIB3017A | Assemble and dismantle boom or jib | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| S553 | TLI30907 | Certificate III in Transport and Logistics (Mobile Cranes Operations) | Qualification |
| S560 | TLI40907 | Certificate IV in Transport and Logistics (Mobile Cranes Operations) | Qualification |