Unit of competency Outline

Date retreived
23/07/2026 5:16 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Travel medium or heavy self-propelled on-track equipment

Travel medium or heavy self-propelled on-track equipment

Unit of competency
National Code
TLIC2058
State Code
AVK13
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
29/01/2021
State Implementation and Classification
Approved Date
23/02/2016
Field of Education
039907 - Rail Operations
Original Release Date
23/02/2016
Nominal Hours
20
Description
This unit involves the skills and knowledge required to travel a medium or heavy self-propelled on-track vehicle on a rail network in accordance with the rail network owner policies and procedures.It includes performing pre-operating checks, obtaining appropriate authority to travel, stabling medium or heavy self-propelled on-track vehicle, performing post-operational procedures and completing documentation.This unit involves the application of Rail Infrastructure Manager operational procedures to travel a medium or heavy self-propelled on-track vehicle, as part of workplace activities across a variety of operational contexts.Medium or heavy self-propelled on-track vehicles may include:ballast cleanerballast regulatordynamic stabiliserinserter/remover (TR10)rail cranerail grinderspot tampertampertrack layertrack recorder.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines to operate each individual piece of equipment.Operators will need to have fulfilled licence and certification requirements for the type of equipment being used.
Notes
Elements and Performance Criteria
1 Perform pre-operational checks
  • 1.1 Hazards are identified, risks assessed and control measures implemented
  • 1.2 Detailed pre-operational checks are conducted in accordance with manufacturer specifications and organisational procedures
  • 1.3 Logbooks are checked and completed in accordance with organisational requirements and manufacturer specifications
  • 1.4 Problems are identified and rectified in accordance with organisational procedures
  • 1.5 Identified problems are reported and documented in accordance with organisational procedures
2 Obtain appropriate authority to travel
  • 2.1 Authority is obtained from appropriate person to travel from siding or on/off tracking location to designated location in accordance with Rail Infrastructure Manager procedures
  • 2.2 Communications with Network Control Officer is maintained using appropriate communications protocols and systems, in accordance with Rail Infrastructure Manager requirements and workplace procedures
  • 2.3 Authority to travel is recorded in accordance with organisational procedures
3 Travel vehicle
  • 3.1 Vehicle is travelled in a safe and efficient manner in accordance with relevant codes of practice, safeworking systems, manufacturer specifications, and organisational and Rail Infrastructure Manager procedures
  • 3.2 Contingencies are responded to appropriately
4 Stable medium or heavy self-propelled on-track vehicle
  • 4.1 Approval is requested from appropriate person to stable self-propelled on-track vehicle
  • 4.2 Nominated stabling location and timing is confirmed
  • 4.3 Vehicle is moved to nominated stabling location
  • 4.4 Appropriate person is contacted and informed that vehicle is at nominated location and intact
  • 4.5 Vehicle is stabled as directed and left in appropriate manner to ensure security and protection of vehicle and ancillary equipment
5 Perform post-operational procedures
  • 5.1 Post-operational checks are conducted in accordance with manufacturer specifications and organisational procedures, to identify defects and maintenance requirements
  • 5.2 Identified problems are reported in accordance with organisational procedures
  • 5.3 Post-operational service schedules are conducted in accordance with organisational procedures
6 Complete documentation
  • 6.1 Required documentation procedures and processes are confirmed
  • 6.2 Documentation is filled in legibly and proofread
  • 6.3 Documentation is processed in accordance with workplace procedures
No information
No information
Replaces
State Code National Code Title Type
S8271 TLIC2058A Travel medium or heavy self-propelled on-track equipment Unit of competency