Unit of competency Outline

Date retreived
22/07/2026 10:52 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Set up for foil stamping

Set up for foil stamping

Unit of competency
National Code
ICPPR261C
State Code
D3160
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
05/07/2010
State Implementation and Classification
Approved Date
09/09/2014
Field of Education
030103 - Printing
Original Release Date
09/09/2014
Nominal Hours
30
Description
This unit describes the performance outcomes, skills and knowledge required to set up for gold blocking and hot foil stamping.
Notes
Elements and Performance Criteria
1. Confirm job specifications
  • 1.1. Job requirements are read and interpreted from job documentation or production control system
  • 1.2. Set up is carried out correctly in minimum time with minimum wastage
  • 1.3. Availability of all job related components is checked
2. Set up machine
  • 2.1. Die or block is selected and checked against job ticket
  • 2.2. Die or block is locked into chase and checked for correct positioning
  • 2.3. Chase is mounted in press
  • 2.4. Foil transfer or feed system is set up and adjusted according to image size and job specifications
  • 2.5. If required, in-line loading and ejection units are set up for basic processes and adjusted according to machine requirements and job specifications
3. Set up reel system (OR Element 4 OR Element 5)
  • 3.1. Unwind and rewind reels are is set up and adjusted according to job specifications
  • 3.2. Webbing procedures are carried out and web-control system is set up and adjusted according to job specifications
  • 3.3. Reels are spliced/joined according to job specifications
  • 3.4. Printed web viewing devices are set up and adjusted according to job specifications
  • 3.5. Folder and sheeter are set up and adjusted suit job specifications
  • 3.6. Set off/marking prevention devices are set up and adjusted according to job specifications
4. Set up sheet system (OR Element 3 OR Element 5)
  • 4.1. Feeder and delivery is set up and adjusted according to job specifications
  • 4.2. Sheet pick-up and transportation system is set up and adjusted according to job specifications
  • 4.3. Transfer and control systems are set up and adjusted according to job specifications
  • 4.4. Set off/marking prevention devices are set up and adjusted according to job specifications
  • 4.5. Substrate is added to and removed from process according to job instructions
5. Set up product jigs onto machine table (OR Element 3 OR Element 4)
  • 5.1. Jigs are selected to suit product to be stamped
  • 5.2. Jigs are fitted to machine table according to job specifications
  • 5.3. Table height is adjusted to suit product
6. Select foils
  • 6.1. Foils are selected according to job specifications and end-user requirements
  • 6.2. Quality and suitability of foils are checked and appropriate action is taken
  • 6.3. Foils are selected according to suitability of substrate, physical and chemical performance and properties
  • 6.4. Foils are prepared according to OHS requirements, and manufacturer's/supplier's instructions with suitable precautions to minimise waste
  • 6.5. Foils are appropriately labelled, handled and stored according to manufacturer's/supplier's instructions to prevent damage and hazards to personnel and prolong shelf life
7. Conduct proof run
  • 7.1. Material to be used for proof is organised correctly
  • 7.2. Machine is operated according to manufacturer's and enterprise procedures to produce a specified proof
  • 7.3. Proof is visually inspected and/or tested or laboratory testing organised according to enterprise procedures
  • 7.4. Production does not commence without client OK or authority where appropriate
  • 7.5. Results are interpreted and adjustment changes are carried out according to product and machine specifications to determine adjustment requirements
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
In-line processes may include:
minor processes that are integral to this competency can include basic in-line operations such as perforating, numbering, date coding, slitting that do not in themselves constitute another defined unit of competency. Where a major in-line process is defined as a separate competency (eg flat-bed cutting, folding) it should be assessed as such.
Machines may include:
a range of foil stamping machines, including machines with computerised monitoring and/or control.
Substrate handling may include:
wide or narrow reel or large or small sheet or 3D object handling systems.
Foils may include:
range of foils used in gold blocking and hot foil stamping.
Substrate types may include:
range of substrates within the major categories of paper, pressure sensitive material, board, wood, plastics and related films, metal injection moulded plastics, moulded plastics, lacquered substrate.
Colour matchingsystems may include:
use of visual colour assessment and matching under controlled lighting conditions.
Design may include:
simple graphics and text. Minor variation in registration and position.
EVIDENCE GUIDE
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the ability to:
set up a die or block and the reel or sheet systems and jigs for gold blocking or hot foil stamping. The individual will conduct a proof run and adjust settings to ensure production speeds are attained
demonstrate use of computerised control, monitoring and data entry systems if available and appropriate
demonstrate an ability to find and use information relevant to the task from a variety of information sources
demonstrate all safety devices on the machine
set up for foil stamping on TWO occasions (if possible including at least ONE in-line process if relevant) according to manufacturer's and job specifications, enterprise procedures and the listed Performance Criteria
evidence for assessment may be gathered from assessment of the unit of competency alone or through an integrated assessment activity.

Context of and specific resources for assessment
Assessment must ensure:
assessment may take place on the job, off the job or a combination of these. Off the job assessment must be undertaken in a closely simulated workplace environment
gold blocking or hot foil stamping machine.

Method of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
direct questioning combined with review of portfolios of evidence and third party workplace reports of on-the-job performance by the candidate.

Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, for example:
ICPSU201C Prepare, load and unload reels and cores on and off machine
ICPSU202C Prepare, load and unload product on and off machine
ICPSU207C Prepare machine for operation (basic)
ICPPR262C Produce foil stamped product.
Replaces
State Code National Code Title Type
D0423 ICPPR261B Set up for foil stamping Unit of competency
Replaced By
State Code National Code Title Type
AUO14 ICPPRN261 Set up for foil stamping Unit of competency