Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install and maintain surface track drainage
Install and maintain surface track drainage
Unit of competency
National Code
TLIS0002
TLIS0002
State Code
OCY85
OCY85
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
01/04/2021
Field of Education
039907 - Rail Operations
Original Release Date
01/04/2021
Nominal Hours
35
Description
This unit involves the skills and knowledge required to install and/or maintain surface track drainage manually and mechanically in accordance with safeworking and regulatory requirements, and workplace procedures.It includes determining the job requirements, carrying out the maintenance of track drainage in accordance with work orders and completing all required documentation.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.Work is performed under some supervision, generally within a team environment. It involves the application of routine operational principles and procedures when installing and maintaining surface track drainage maintenance, as part of workplace activities across a variety of operational contexts within the Australian rail system.Operators of mechanised equipment must have undertaken training and, where appropriate, hold the relevant licence, permit or certificate and be recognised as competent for the class of machinery being used.
Notes
Elements and Performance Criteria
1 Determine job requirements
- 1.1 Worksite is identified
- 1.2 Hazards are identified, risks are assessed and control measures are implemented
- 1.3 Underground services are identified as required and marked to protect services from excavation
- 1.4 Work method and resources are selected to meet job requirements
2 Undertake track drainage work
- 2.1 Environmental protection requirements are implemented as required
- 2.2 Drainage is cleaned to relevant standard by mechanical methods in accordance with workplace standards and/or procedures
- 2.3 Drainage is cleaned, repaired or installed to relevant standard by manual methods in accordance with workplace standards and/or procedures
- 2.4 Work is completed to meet drainage requirements
3 Complete documentation
- 3.1 Required documentation procedures and processes are confirmed
- 3.2 Documentation is filled in legibly and proofread
- 3.3 Documentation is processed in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| AVH82 | TLIS2027 | Install and maintain surface track drainage | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BHV6 | TLI37122 | Certificate III in Rail Infrastructure | Qualification |
| BGM7 | TLI27120 | Certificate II in Rail Infrastructure | Qualification |
| BGM6 | TLI37120 | Certificate III in Rail Infrastructure | Qualification |
| BHI6 | TLI37121 | Certificate III in Rail Infrastructure | Qualification |
| BHH8 | TLI27121 | Certificate II in Rail Infrastructure | Qualification |
| BHH1 | TLI32121 | Certificate III in Rail Structures | Qualification |
| AWT7 | TLI32115 | Certificate III in Rail Structures | Qualification |