Unit of competency Outline

Date retreived
22/07/2026 3:01 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Remove and replace conveyor belts

Remove and replace conveyor belts

Unit of competency
National Code
PMBPROD367B
State Code
W7661
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
01/05/2011
State Implementation and Classification
Approved Date
12/03/2009
Field of Education
030701 - Mechanical Engineering
Original Release Date
12/03/2009
Nominal Hours
10
Description
This competency covers the removal and replacement of conveyor belts in contracted, remote site locations. It covers all types of industrial conveyor belts in standard configurations.
Notes
Elements and Performance Criteria
1. Plan for conveyor belt replacement.
  • 1.1 Review belt specifications and work order documentation.
  • 1.2 Identify hazards and risk controls.
  • 1.3 Review plan to ensure that downtime is minimised, materials are used economically and quality standards are met.
  • 1.4 Ensure that all permissions and permits have been obtained.
  • 1.5 Ensure that all required equipment, tools and materials are available and have been checked for condition, quality and compliance tags.
  • 1.6 Ensure that a safe work area has been established.
2. Remove and replace conveyor belt.
  • 2.1 Examine the conveyor system for and eliminate sources of potential belt damage.
  • 2.2 Facilitate removal of conveyed materials from the belt
  • 2.3 Identify and eliminate any residual dangerous or hazardous substances or contaminants.
  • 2.3 Ensure conveyor equipment is disengaged and locked out.
  • 2.4 Remove tension from belt, as required.
  • 2.5 Set up equipment to appropriately support the removal and replacement of belt, without unnecessary twisting or bending.
  • 2.6 Remove existing belt and track replacement belt onto rollers.
  • 2.7 Store removed belt appropriately.
  • 2.8 Ensure new belt is spliced according to procedures.
3. Commission conveyor belt.
  • 3.1 Inspect belt condition for imperfections or irregularities.
  • 3.2 Start conveyor or monitor start up to procedures.
  • 3.3 Monitor and adjust tracking, speed and tensions as required.
  • 3.4 Observe belt in operation and identify conditions which may require emergency shutdown of equipment.
  • 3.5 Give appropriate notice of any impending shut down to procedures.
  • 3.6 Follow shutdown procedures.
4. Clean work area.
  • 4.1 Clean work area and return to approved condition.
  • 4.2 Follow all waste and recycling procedures.
  • 4.3 Complete documentation
5. Anticipate and solve problems
  • 5.1 Recognise a problem or a potential problem.
  • 5.2 Determine problems needing priority action.
  • 5.3 Refer problems outside area of responsibility to appropriate person, with possible causes.
  • 5.4 Seek information and assistance as required to solve problems.
  • 5.5 Solve problems within area of responsibility.
  • 5.6 Follow through items initiated until final resolution has occurred.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.
Where reference is made to industry codes of practice and/or Australian/international standards, the latest version must be used.
Context
This competency applies to the removal and replacement of conveyor belts. It includes the operation of all relevant additional equipment where that equipment is integral to the belt removal and replacement process. The competency unit includes the use of manual handling aids such hand winches and portable lifting gear, and of powered equipment/aids for some aspects.
Procedures
All operations are performed in accordance with procedures.
Procedures include all relevant workplace procedures, work instructions, temporary instructions and relevant industry and government codes and standards.
Tools and equipment
This competency covers different types of conveyor belts, including:
steel cord belts
fabric reinforced ply belts
solid woven belts.
The competency includes use of equipment and tools such as:
portable power generators and vulcanising equipment
knives and other cutting instruments
belt winders, belt stands and winches
clips, pulling plates, steel cables (certified as required)
portable hoists/lifting equipment not requiring any special permits or licences
hand tools (such as spanners, wrenches, hammers)
power operated hand tools (such as drills, cutting disks, sanders)
relevant personal protective equipment
Hazards
Typical hazards include:
unpredicted belt movements
equipment malfunctions
manual handling hazards
lifting, tracking and securing hazards
equipment operation hazards
damaged material hazards.
Problems
'Anticipate and solve problems' means resolve a wide range of routine and non-routine problems, using product and process knowledge to develop solutions to problems which do not have a known solution/a solution recorded in the procedures.
Typical process and product problems may include:
weight of the belting to be removed and replaced
obstructions and impediments to removal and fitting on new belt
worn or malfunctioning rollers, drums or propulsion equipment
lack of accessibility
lack of required human resources
tool problems
variations in materials and/or contamination of materials
processing problems.
Variables
Key variables to be monitored include:
belt condition
belt location
gradient of belt
types of scrapers
skirting systems used
degree of damage
weight of the belt
forces acting on the conveyor belt
environmental conditions
lock-out of equipment.
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, the range statement and the assessment guidelines for this training package.
Overview of assessment
A holistic approach should be taken to the assessment.
Assessors must be satisfied that the person can consistently perform the unit as a whole, as defined by the Elements, Performance Criteria and skills and knowledge.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
It is essential that competence is demonstrated in the knowledge and skills defined in this unit. These may include the ability to:
identify critical materials properties and belt removal and replacement process characteristics
identify hazards in the removal and replacement process and put in place appropriate controls
plan own work process within workplace procedures and explain the reasons for the steps in the process
take appropriate action to observe equipment, materials and products for out of specification results, make adjustments and identify problems to be reported.
Consistent performance should be demonstrated. For example, look to see that:
production quality and output standards are met consistently
problems are anticipated from process observations
problems are efficiently resolved
the removal and replacement process runs consistently and smoothly.
Assessment method and context
Assessment will occur in the field on an industrial conveyor belt installation.
Competence in this unit may be assessed:
on a processing plant, allowing for operation under all normal and a range of abnormal conditions
in a situation allowing for the generation of evidence of the ability to recognise, anticipate and respond to problems
by using a suitable simulation and/or a range of case studies/scenarios
through a combination of these techniques.
In all cases it is expected that practical assessment will be combined with targeted questioning to assess the underpinning knowledge and theoretical assessment will be combined with appropriate practical/simulation or similar assessment. Assessors need to be aware of any cultural issues that may affect responses to questions.
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the assessee and the work being performed.
Specific resources for assessment
This section should be read in conjunction with the Range Statement for this unit of competency. Resources required include suitable access to an operating plant or equipment that allows for appropriate and realistic simulation. A bank of case studies/scenarios and questions will also be required to the extent that they form part of the assessment method. Questioning may take place either in the workplace, or in an adjacent, quiet facility such as an office or lunchroom. No other special resources are required.
Access must be provided to appropriate learning and/or assessment support when required. Where applicable, physical resources should include equipment modified for people with disabilities.
Replaces
State Code National Code Title Type
C5697 PMBPROD367A Remove and replace belts Unit of competency
Replaced By
State Code National Code Title Type
BAI33 PMBPROD367 Remove and replace conveyor belts Unit of competency
State Code National Code Title Type
W400 PMB30107 Certificate III in Polymer Processing Qualification
W401 PMB40107 Certificate IV in Polymer Technology Qualification