Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Receive, check and record concrete deliveries

Receive, check and record concrete deliveries

Unit of competency
National Code
RIICRC322D
State Code
WH138
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
2.00
Current Release Date
07/12/2014
State Implementation and Classification
Approved Date
27/05/2014
Field of Education
089901 - Purchasing, Warehousing And Distribution
Original Release Date
27/05/2014
Nominal Hours
8
Description
This unit describes a participant’s skills and knowledge required to receive, check and record concrete deliveries in Civil Construction.This unit is appropriate for those working in operational roles. No licensing, legislation or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Plan and prepare to receive, check and record concrete deliveries
  • 1.1 Access, interpret and apply documentation for receiving, checking and recording concrete deliveries and ensure the work activity is compliant
  • 1.2 Obtain, read, interpret, clarify and confirm work requirements
  • 1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures
  • 1.4 Select and wear correct personal protective equipment appropriate for work activities
  • 1.5 Identify, obtain, confirm and implement signage requirements
  • 1.6 Select and check for faults to plant, tools and equipment, to carry out tasks
2. Receive concrete
  • 2.1 Identify survey datum points required to accurately locate material placement
  • 2.2 Check delivery documents for accuracy against ordered material
  • 2.3 Check delivery docket for compliance with test results
  • 2.4 Check for compliance of delivery docket with batching times
  • 2.5 Direct required action for non-compliant loads
  • 2.6 Direct concrete delivery vehicle to location for discharge
  • 2.7 Monitor movements and hazards and identify and communicate changes to the work environment during the work process
3. Tip/discharge concrete
  • 3.1 Maintain safe working area around pour location
  • 3.2 Establish actual pour location of discharged load
  • 3.3 Discharge concrete from delivery vehicle directly or via chute or material handling equipment
  • 3.4 Discharge concrete to required placement level
  • 3.5 Visually assess load for uniformity and consistency to test results recorded on delivery docket
  • 3.6 Direct delivery vehicle safely away from pour location once discharge is complete
4. Record information
  • 4.1 Record appropriate details from the delivery docket
  • 4.2 Record the time and location of the discharge of the load
  • 4.3 Record additional information as required by worksite procedures
  • 4.4 Compete end of day records and dockets and pass onto appropriate site personnel completed days records
5. Clean up
  • 5.1 Clean work area and dispose of, reuse or recycle materials
  • 5.2 Clean, check, maintain and store tools and equipment
No information
No information
Replaces
State Code National Code Title Type
WC341 RIICRC322 Receive, check and record concrete deliveries Unit of competency
Replaced By
State Code National Code Title Type
OCW71 RIICRC322E Receive, check and record concrete deliveries Unit of competency