Unit of competency Outline
Date retreived
22/07/2026 4:52 PM AWST
22/07/2026 4:52 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Plan a quarry
Plan a quarry
Unit of competency
National Code
FWPFGM4208
FWPFGM4208
State Code
AXK55
AXK55
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
05/10/2016
Field of Education
030901 - Construction Engineering
Original Release Date
05/10/2016
Nominal Hours
120
Description
This unit of competency describes the outcomes required to locate the site, and gain approval for a quarry (borrow pit) operation for the purpose of sourcing material for the construction and maintenance of forest roads and tracks. It also includes developing and implementing a plan to establish a quarry.The unit applies to job roles including Arboriculture Supervisor, Farm Forestry Supervisor, Forestry Supervisor, Forestry Operations Supervisor, Harvesting Supervisor, Harvesting Team Leader, Propagation and Stand Health Supervisor and Tree Farm Supervisor.No licensing, legislative, regulatory, or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Plan for quarry operation
- 1.1 Review need for quarry operation.
- 1.2 Consult with relevant parties about land tenure and plans for possible sites for the quarry.
- 1.3 Inspect proposed locations for quarry and visually assess for suitability and quantity and quality of material for end use.
- 1.4 Analyse samples of materials and test for suitability.
- 1.5 Identify environmental protection measures of site and any regulatory or zoning issues.
- 1.6 Conduct a cost-benefit analysis for the viability and lifespan of the proposed quarry site.
- 1.7 Prepare a quarry management plan with reference to site procedures.
2. Implement a quarry operation plan
- 2.1 Obtain necessary licences or permits for quarry development.
- 2.2 Select quantities required and methods of extracting material with reference to the quarry management plan.
- 2.3 Coordinate and schedule people, materials and equipment for quarry development.
- 2.4 Liaise with colleagues about other information, work plans, road maintenance or construction plans and ensure a coordinated approach.
- 2.5 Document activities according to organisational procedures.
3. Monitor and review quarry planning
- 3.1 Check compliance with environmental protection measures, WHS requirements, quality requirements.
- 3.2 Review outputs of quarry against plan.
- 3.3 Identify areas for improvement in establishment and operation of quarry.
- 3.4 Record and report on outcomes to appropriate personnel
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D6015 | FPIFGM4208B | Plan a quarry | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| ODS44 | FWPCOT4214 | Plan for and coordinate quarry operations | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAL1 | FWP40116 | Certificate IV in Forest Operations | Qualification |