Unit of competency Outline
Date retreived
22/07/2026 2:37 PM AWST
22/07/2026 2:37 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Develop detailed and complex drawings for electrical systems using CAD systems
Develop detailed and complex drawings for electrical systems using CAD systems
Unit of competency
National Code
UEEEL0006
UEEEL0006
State Code
OBY82
OBY82
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
020115 - Computer Graphics
Original Release Date
12/07/2021
Nominal Hours
54
Description
This unit involves the skills and knowledge required to develop detailed and complex drawings for electrical systems using computer-aided design (CAD) systems.It includes 2-D and 3-D drawing formats covering a representative range of electrical systems, such as installations with alternative supplies, installations over 400 ampere (A) per phase at low voltage (LV) and/or high voltage (HV), single or multi-tenancies, heavy plant, switchgear, protection systems, earthing, power factor correction, control equipment, and energy monitoring and management.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare to develop detailed and complex drawings for electrical systems
- 1.1 Work health and safety (WHS)/occupational health and safety (OHS) processes and workplace procedures for a given work area are identified, obtained and applied
- 1.2 WHS/OHS risk control measures and workplace procedures in preparation for the work are followed
- 1.3 The scope of detailed and complex electrical drawings is interpreted from workplace documentation and/or work instructions
- 1.4 Electrical drawing details required for work are identified in accordance with project specifications and workplace procedures
- 1.5 Relevant personnel are consulted to ensure the work is coordinated effectively with others
- 1.6 Relevant software tools, components, materials and equipment needed for the work are selected in accordance with workplace procedures
2 Develop detailed and complex drawings for electrical systems
- 2.1 WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
- 2.2 Design layouts and detailed and complex electrical drawings are determined from project specifications for the electrical systems
- 2.3 Technical data of electrical system component/s are identified to determine parameters to be detailed in electrical drawings
- 2.4 Relevant software tools are used to produce detailed and complex electrical drawings in accordance with workplace procedures
- 2.5 Detailed and complex electrical drawings are checked for accuracy in accordance with project specifications and workplace procedures
- 2.6 Unplanned situations are dealt with safely and in accordance with workplace procedures
3 Complete detailed and complex drawings for electrical systems
- 3.1 Completed detailed and complex electrical drawings are submitted to relevant person/s to be checked for accuracy in accordance with project specifications and workplace procedures
- 3.2 Alterations, additions or correction instructions are followed and detailed and complex electrical drawings re-submitted for final approval
- 3.3 Completed detailed and complex electrical drawings are documented in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WC518 | UEENEEG180A | Develop detailed and complex drawings for electrical systems using CAD systems | Unit of competency |