Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Assist in commissioning process and instrumentation control systems
Assist in commissioning process and instrumentation control systems
Unit of competency
National Code
UEEIC0003
UEEIC0003
State Code
OCB24
OCB24
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
12/07/2021
Nominal Hours
36
Description
This unit involves the skills and knowledge required to assist in commissioning of process control systems. It includes working safely and with others, complying with requirements, applying knowledge of process and control components, pre-commissioning tests, checking and adjusting components and controls to ensure efficient and safe operation and completing commissioning documentation.Permits may be required for some work environments, such as confined spaces, working aloft, near live electrical apparatus and site rehabilitation.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare to assist in commissioning process control systems
- 1.1 Work health and safety (WHS)/occupational health and safety (OHS) processes and workplace procedures for a given work area are identified, obtained and applied
- 1.2 WHS/OHS risk control measures and workplace procedures are followed in preparation for work
- 1.3 Safety hazards that have not previously been identified are noted and risk control measures implemented
- 1.4 Commissioning plan is reviewed with relevant team members to ensure commissioning role/s of members are identified and ensure work is coordinated effectively in accordance with workplace procedures
- 1.5 Measurement parameters are identified with team in accordance with workplace procedures, process requirements and manufacturer instructions
- 1.6 Tools, equipment and testing devices required for work are obtained in accordance with workplace procedures and checked for correct operation and safety
- 1.7 Preparatory work is checked to ensure no damage has occurred and work is in accordance with relevant industry standards
- 1.8 Need to test and measure live work is determined in accordance with WHS/OHS requirements and workplace procedures
- 1.9 Circuits are checked and isolated in accordance with WHS/OHS requirements and workplace procedures
2 Assist in commissioning process control systems
- 2.1 WHS/OHS risk control measures and workplace procedures for carrying out work are followed
- 2.2 Commissioning testing/measuring devices are connected and set up in accordance with relevant industry standards for control system and work instructions
- 2.3 Process instruments and apparatus are set up and adjusted in accordance with relevant industry standards, process control requirements, equipment manufacturer instructions and work instructions
- 2.4 Adjustments are made to provide optimum transmission/reception performance in accordance with relevant industry standards
- 2.5 Decisions for dealing with unplanned situations are made from discussions with relevant person/s and/or job specifications
- 2.6 Methods for dealing with unplanned situations are selected in accordance with WHS/OHS requirements and job specifications
- 2.7 Commissioning assistance is carried out efficiently without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy principles
3 Complete and report commissioning activities
- 3.1 WHS/OHS risk control work completion measures and workplace procedures are followed
- 3.2 Worksite is cleaned and made safe in accordance with workplace procedures
- 3.3 Adjustment settings are documented and relevant person/s notified in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WC638 | UEENEEI122A | Assist in commissioning process and instrumentation control systems | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BFQ4 | UEE43220 | Certificate IV in Industrial Automation and Control | Qualification |
| BOA8 | UEE43225 | Certificate IV in Industrial Automation and Control | Qualification |
| BFP2 | UEE42220 | Certificate IV in Instrumentation and Control | Qualification |
| BHC7 | UEE61521 | Advanced Diploma of Instrumentation and Control Engineering | Qualification |
| BFK6 | UEE51020 | Diploma of Instrumentation and Control Engineering | Qualification |