Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install LNG fuel systems

Install LNG fuel systems

Unit of competency
National Code
AURTTL006
State Code
AXA54
TGA Status
Deleted
DTWD Status
Deleted
Current Release Number
1.00
Current Release Date
14/04/2016
State Implementation and Classification
Approved Date
13/07/2016
Field of Education
030503 - Vehicle Mechanics
Original Release Date
13/07/2016
Nominal Hours
30
Description
This unit describes the performance outcomes required to install liquefied natural gas (LNG) fuel systems. It involves preparing for the task, selecting, installing, testing and adjusting the system for correct operation, and completing workplace processes and documentation.It applies to those working in the automotive service and repair industry. The LNG fuel systems include those of agricultural machinery, forklifts, heavy commercial vehicles, light vehicles or mobile plant machinery. Licensing, legislative, regulatory or certification requirements may apply to this unit in some jurisdictions. Users are advised to check with the relevant regulatory authority.
Notes
Elements and Performance Criteria
1. Prepare to install LNG fuel system
  • 1.1 Job requirements are determined from workplace instructions
  • 1.2 LNG fuel system installation information is sourced and interpreted
  • 1.3 Installation options are analysed and those most appropriate to the circumstances are selected
  • 1.4 Hazards associated with the work are identified and risks are managed
  • 1.5 Tools, equipment and materials are selected and checked for serviceability
2. Carry out installation activities
  • 2.1 LNG fuel system is checked for correct application and components are checked for damage
  • 2.2 LNG fuel system components are installed according to workplace procedures, manufacturer specifications, safety and environmental requirements and AS/NZS 2739 Natural gas (NG) fuel systems for vehicle engines, and without causing damage to components or systems
  • 2.3 Installed LNG fuel system is tested for correct operation and required adjustments are made according to manufacturer specifications, workplace procedures, safety requirements, and AS/NZS 2739
3. Complete work processes
  • 3.1 Final inspection is made to ensure work is to workplace expectations and system is presented ready for use
  • 3.2 Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
  • 3.3 Tools and equipment are checked and stored according to workplace procedures
  • 3.4 Workplace documentation is processed according to workplace procedures
No information
No information
Replaces
State Code National Code Title Type