Qualification Outline
22/07/2026 4:23 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Certificate IV in ESI Generation - Systems Operations
Certificate IV in ESI Generation - Systems Operations
UEP40112
J253
Replaced
Replaced
National Endorsed, State Implementation and Classification
Releases
| Release Version | Release Date | TGA Status | DTWD Status |
|---|---|---|---|
| 3.00 | 07/09/2013 | Current | Approved |
Description
Scope: Those gaining this qualification will be able to complete work function such as remote operation of network equipment and isolation of plant and equipment for work, coordination of work activities, cost estimations, observation of safe working practices and environmental procedures. Supervision of others and coordination of work activities of individuals and/or team.
Schedule
Packaging Rules
The requirements for granting this qualification will be met when competency is demonstrated and achieved for:- Fifteen (15) core units
- A combination of elective units to achieve a total weighting of 800 points:
- A maximum of 220 weighting points may be chosen from Group A Imported and Common Elective Units
- A maximum of 700 weighting points may be chosen from Group B Elective Units.
- A minimum of 100 to a maximum of 800 weighting points may be chosen from Group C Elective Units.
Imported units from other training packages and/or state accredited courses can be added to this group, but they must be selected from qualifications where the unit is first packaged at AQF level 4. If units have not being assigned a weighting by the relevant EE-Oz Industry Technical Advisory Committee, their weighting will be 10 points.
Note:
1. Prerequisite pathways shall be identified and met for all elective units selected.
2. In selecting elective units considerations to career planning advice should be given to units that form part of a prerequisite pathway for the progression to achieve particular competencies or qualification at a higher level.
1. Core Units
All fifteen (15) units must be completed.
2. Group A Imported and Common Elective Units
A maximum of 220 weighting points may be chosen from Group A.
Please refer to the Training Package for the full list of unit weighting points.
3. Group B Elective Units
A maximum of 700 weighting points may be chosen from Group B.
Please refer to the Training Package for the full list of unit weighting points.
4. Group C Elective Units
A minimum of 100 to a maximum of 800 weighting points may be chosen from Group C.
Please refer to the Training Package for the full list of unit weighting points.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BEC0 | UEP40118 | Certificate IV in ESI Generation - Systems Operations | Qualification |
No information
Entry Requirements
Not applicable.
Traineeships and Apprenticeships
Part-time is defined as a minimum of 20 hours per week.