Unit of competency Outline

Date retreived
22/07/2026 3:24 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Set up in-line scoring, folding and gluing machine for envelope manufacture

Set up in-line scoring, folding and gluing machine for envelope manufacture

Unit of competency
National Code
ICPCBF396
State Code
AUP16
TGA Status
Deleted
DTWD Status
Transition (Deleted)
Current Release Number
1.00
Current Release Date
26/03/2015
State Implementation and Classification
Approved Date
16/09/2015
Field of Education
030103 - Printing
Original Release Date
16/09/2015
Nominal Hours
50
Description
This unit describes the skills and knowledge required to set up in-line scoring, folding and gluing machines used in the manufacture of envelopes.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Set up and adjust units
  • 1.1 All details required for job are checked and confirmed against job specifications
  • 1.2 Correct materials are checked and made available for the job
  • 1.3 Adhesives appropriate for the substrate, application process, and machine are selected
  • 1.4 Work area is made safe and ready for production according to safety requirements
  • 1.5 Blades are sharp and fitted as necessary, with units calibrated according to job specifications
  • 1.6 Settings are checked against job specifications before production is commenced
  • 1.7 Adhesives are positioned correctly and applied evenly
2. Confirm quality of output
  • 2.1 A sample from the machine is selected and checked to ensure it conforms to required quality standards
  • 2.2 Adjustments are made when standards are not met
  • 2.3 Each in-line process is monitored and minor adjustments made during production, as required
  • 2.4 Samples are continuously monitored for defects, and removed where relevant
  • 2.5 Efficiency, quality and output rate of the production run are monitored for problems, and any deficiencies resolved
  • 2.6 Wastage is monitored, kept to a minimum and correctly disposed of according to enterprise quality standards
  • 2.7 Locations of all emergency shutdown buttons and triggers are known
No information
No information
Replaces
State Code National Code Title Type
D3071 ICPCF396C Set up in-line scoring, folding and gluing machine for envelope manufacture Unit of competency