Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Perform gland packing

Perform gland packing

Unit of competency
National Code
MEM18013
State Code
OAU81
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
26/06/2019
State Implementation and Classification
Approved Date
24/01/2020
Field of Education
030707 - Metal Fitting, Turning And MacHining
Original Release Date
24/01/2020
Nominal Hours
18
Description
This unit of competency defines the skills and knowledge required to inspect glands and gland packing and remove and replace or top up gland packing. It applies to packing for high or low temperatures and pressures, solids, gases and liquids.Where interpretation of technical drawings is required unit MEM09002 Interpret technical drawing should also be selected.Where the selection and use of power tools/hand held operations is required unit MEM18002 Use power tools/hand held operations should also be selected.Where skills that relate to maintaining simple gland top-ups in non-critical applications and routine gland maintenance are required unit MEM18006 Perform precision fitting of engineering components should be selected.No licensing, legislative or certification requirements apply to this unit at the time of publication.Band: AUnit Weight: 2
Notes
Elements and Performance Criteria
1 Determine job requirements
  • 1.1 Follow standard operating procedures (SOPs)
  • 1.2 Comply with work health and safety (WHS) requirements at all times
  • 1.3 Use appropriate personal protective equipment (PPE) in accordance with SOPs
  • 1.4 Identify job requirements from specifications, job sheets or work instructions
2 Inspect glands and gland packing
  • 2.1 Apply principles of gland packing
  • 2.2 Inspect stuffing box assembly and gland packing and determine packing requirements
3 Remove and replace or top up gland packing
  • 3.1 Extract or remove gland packing using appropriate engineering techniques, tools and equipment
  • 3.2 Select correct and appropriate gland packing and cut to size and shape to conform to application and/or specifications
  • 3.3 Fill the stuffing box with packing material and reassemble the gland using site procedures or manufacturers' recommended procedures