Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Monitor and maintain electrical systems
Monitor and maintain electrical systems
Unit of competency
National Code
PMASUP342B
PMASUP342B
State Code
W8945
W8945
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
18/12/2008
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
18/12/2008
Nominal Hours
40
Description
This competency covers the skills needed to monitor and maintain electrical systems and equipment on systems used to carry products. People performing this competency may be required to possess an electrical licence from a relevant electrical licensing authority, depending on local legislative requirements
Notes
Elements and Performance Criteria
1. Monitor equipment operation
- 1.1. Monitor equipment operation according to electrical equipment operating principles and parameters
- 1.2. Access and interpret relevant technical drawings and schematics to determine system faults
- 1.3. Issue permit to work to allow work to be undertaken
- 1.4. Verify equipment operation/performance through test procedures to ensure correct operation and seek confirmation of identified problems from other sources
- 1.5. Correct operational variations through calibration and adjustment
- 1.6. Document operational variations.
2. Test/repair equipment
- 2.1. Verify equipment is operating correctly and document test results ensuring that statutory electrical testing requirements have been completed
- 2.2. Apply appropriate troubleshooting techniques to determine the cause of detected operational faults
- 2.3. Rectify operational faults through the application of relevant maintenance procedures
- 2.4. Isolate, remove and dispose of faulty equipment, and install new equipment
- 2.5. Verify installed equipment to ensure it meets required operational parameters and conditions
- 2.6. Record all repairs/installations to provide historical records of the condition of system equipment.
3. Recommission systems and equipment
- 3.1. Recommission repaired/installed equipment to on line operation in the correct sequence at the required operational parameters
- 3.2. Monitor or activate systems to ensure they are operating both safely and effectively
- 3.3. Close out permit to work and restore site/system to normal operation.
4. Compile and analyse reports
- 4.1. Collect information concerning deviations/repaired equipment, and put into accepted reporting format
- 4.2. Compile reports ensuring they provide an accurate and ongoing record of deviations in pipeline processes and a current record of pipeline and equipment trends
- 4.3. Utilise information or reports for short and long term planning in deviation control.
RANGE STATEMENT
The Range Statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the Performance Criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.
Codes of practice/ standards
Where reference is made to industry codes of practice, and/or Australian/international standards, the latest version must be used.
Applicable Australian standards/legislation
Applicable Australian standards/legislation may include:
OHS legislation
utility codes and standards
AS 2885: Pipelines - Gas and liquid petroleum
AS 2430.1-1987: Classification of hazardous areas - Explosive gas atmospheres
AS 1768-1991: Lightning protection
AS1596-1997/Amdt 1-1999: Storage and handling of Liquefied Petroleum Gas
AS 1697-1987: Gas transmission and distribution systems (known as the SAA Gas Pipeline Code)
AS 2832.1:1998: Cathodic protection of metals - Pipes and cables
AS 3000:2000: Electrical installations (known as the Australian/New Zealand Wiring Rules)
AS 2239-1993: Galvanic (sacrificial) anodes for cathodic protection.
Electrical equipment
Electrical equipment may include:
voltage regulating equipment
battery banks, eg nicad, lead acid
solar generating equipment
alternators, generators and motors
uninterrupted power supplies (UPS)
control panels
lighting
air conditioning
power tools and electrical leads
SWER lines.
Electrical systems
Electrical systems may include:
emergency shutdown systems
fire systems
solar systems
utility systems
uninterrupted power supply systems
low voltage power systems
SWER line systems
communications systems.
Health, safety and environment (HSE)
All operations to which this unit applies are subject to stringent health, safety and environment requirements, which may be imposed through State or Federal legislation, and these must not be compromised at any time. Where there is an apparent conflict between Performance Criteria and HSE requirements, the HSE requirements take precedence.
Persons are required to have skills in hazard identification, assessment and application of control measures.
Procedures
Procedures may be written, verbal, computer-based or in some other form. They include:
all work instructions
standard operating procedures
formulas/recipes
batch sheets
temporary instructions
any similar instructions provided for the smooth running of the plant.
For the purposes of this Training Package, 'procedures' also includes good operating practice as may be defined by industry codes of practice (eg Responsible Care) and government regulations.
Test equipment
Test equipment may include:
multimeter
chart recorders
data logging equipment
amp and volt meters
watt meters
high voltage testing equipment
earth leakage test equipment
electrical inspection tags.
The use and operation of personal computers, other hardware mediums and associated software is required.
The Range Statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the Performance Criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.
Codes of practice/ standards
Where reference is made to industry codes of practice, and/or Australian/international standards, the latest version must be used.
Applicable Australian standards/legislation
Applicable Australian standards/legislation may include:
OHS legislation
utility codes and standards
AS 2885: Pipelines - Gas and liquid petroleum
AS 2430.1-1987: Classification of hazardous areas - Explosive gas atmospheres
AS 1768-1991: Lightning protection
AS1596-1997/Amdt 1-1999: Storage and handling of Liquefied Petroleum Gas
AS 1697-1987: Gas transmission and distribution systems (known as the SAA Gas Pipeline Code)
AS 2832.1:1998: Cathodic protection of metals - Pipes and cables
AS 3000:2000: Electrical installations (known as the Australian/New Zealand Wiring Rules)
AS 2239-1993: Galvanic (sacrificial) anodes for cathodic protection.
Electrical equipment
Electrical equipment may include:
voltage regulating equipment
battery banks, eg nicad, lead acid
solar generating equipment
alternators, generators and motors
uninterrupted power supplies (UPS)
control panels
lighting
air conditioning
power tools and electrical leads
SWER lines.
Electrical systems
Electrical systems may include:
emergency shutdown systems
fire systems
solar systems
utility systems
uninterrupted power supply systems
low voltage power systems
SWER line systems
communications systems.
Health, safety and environment (HSE)
All operations to which this unit applies are subject to stringent health, safety and environment requirements, which may be imposed through State or Federal legislation, and these must not be compromised at any time. Where there is an apparent conflict between Performance Criteria and HSE requirements, the HSE requirements take precedence.
Persons are required to have skills in hazard identification, assessment and application of control measures.
Procedures
Procedures may be written, verbal, computer-based or in some other form. They include:
all work instructions
standard operating procedures
formulas/recipes
batch sheets
temporary instructions
any similar instructions provided for the smooth running of the plant.
For the purposes of this Training Package, 'procedures' also includes good operating practice as may be defined by industry codes of practice (eg Responsible Care) and government regulations.
Test equipment
Test equipment may include:
multimeter
chart recorders
data logging equipment
amp and volt meters
watt meters
high voltage testing equipment
earth leakage test equipment
electrical inspection tags.
The use and operation of personal computers, other hardware mediums and associated software is required.
EVIDENCE GUIDE
The Evidence Guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Assessment of this unit should include demonstrated competence on actual plant and equipment in a work environment. The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency. Assessment will occur over a range of situations which will include disruptions to normal, smooth operation.
Simulation may be required to allow for assessment of parts of this unit. Simulation should be based on the actual plant and will include walk-throughs of the relevant competency components. Simulations may also include the use of case studies/scenarios and role plays.
This unit of competency requires a significant body of knowledge which will be assessed through questioning and the use of what-if scenarios both on the plant (during demonstration of normal operations and walk-throughs of abnormal operations) and off the plant.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective action. The emphasis should be on the ability to stay out of trouble rather than on recovery from a disaster.
Consistent performance should be demonstrated. In particular look to see that:
early warning signs of equipment/processes needing attention or with potential problems are recognised
the range of possible causes can be identified and analysed and the most likely cause determined
appropriate action is taken to ensure a timely return to full performance
obvious problems in related plant areas are recognised and an appropriate contribution made to their solution.
Also confirm that the person undertaking this competency has the ability to:
implement all OHS and environmental procedures relevant to this unit
apply the permit to work system within the context of this unit
interpret a range of process and system control drawings and schematics in order to undertake required or identified repairs/modifications to electrical systems.
These aspects may be best assessed using a range of scenarios/case studies/what-ifs as the stimulus with a walk-through forming part of the response. These assessment activities should include a range of problems, including new, unusual and improbable situations which may have been generated from the past incident history of the plant, incidents on similar plants around the world, hazard analysis activities and similar sources.
Context of and specific resources for assessment
Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations. A bank of scenarios/case studies/what-ifs will be required as will a bank of questions which will be used to probe the reasoning behind the observable actions.
Method of assessment
In all plants it may be appropriate to assess this unit concurrently with relevant teamwork and communication units. Consider co-assessment with relevant OPS units.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the assessee and the work being performed.
The Evidence Guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Assessment of this unit should include demonstrated competence on actual plant and equipment in a work environment. The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency. Assessment will occur over a range of situations which will include disruptions to normal, smooth operation.
Simulation may be required to allow for assessment of parts of this unit. Simulation should be based on the actual plant and will include walk-throughs of the relevant competency components. Simulations may also include the use of case studies/scenarios and role plays.
This unit of competency requires a significant body of knowledge which will be assessed through questioning and the use of what-if scenarios both on the plant (during demonstration of normal operations and walk-throughs of abnormal operations) and off the plant.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective action. The emphasis should be on the ability to stay out of trouble rather than on recovery from a disaster.
Consistent performance should be demonstrated. In particular look to see that:
early warning signs of equipment/processes needing attention or with potential problems are recognised
the range of possible causes can be identified and analysed and the most likely cause determined
appropriate action is taken to ensure a timely return to full performance
obvious problems in related plant areas are recognised and an appropriate contribution made to their solution.
Also confirm that the person undertaking this competency has the ability to:
implement all OHS and environmental procedures relevant to this unit
apply the permit to work system within the context of this unit
interpret a range of process and system control drawings and schematics in order to undertake required or identified repairs/modifications to electrical systems.
These aspects may be best assessed using a range of scenarios/case studies/what-ifs as the stimulus with a walk-through forming part of the response. These assessment activities should include a range of problems, including new, unusual and improbable situations which may have been generated from the past incident history of the plant, incidents on similar plants around the world, hazard analysis activities and similar sources.
Context of and specific resources for assessment
Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations. A bank of scenarios/case studies/what-ifs will be required as will a bank of questions which will be used to probe the reasoning behind the observable actions.
Method of assessment
In all plants it may be appropriate to assess this unit concurrently with relevant teamwork and communication units. Consider co-assessment with relevant OPS units.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the assessee and the work being performed.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| C6049 | PMASUP342A | Monitor and maintain electrical systems | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AXM40 | PMASUP342 | Monitor and maintain electrical systems | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J572 | PMA30113 | Certificate III in Process Plant Operations | Qualification |
| W516 | PMA30108 | Certificate III in Process Plant Operations | Qualification |
| J571 | PMA40113 | Certificate IV in Process Plant Technology | Qualification |
| W517 | PMA40108 | Certificate IV in Process Plant Technology | Qualification |