Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Adjust batch
Adjust batch
Unit of competency
National Code
PMAOPS319A
PMAOPS319A
State Code
W8874
W8874
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
05/09/2013
Field of Education
030717 - Plant And Machine Operations
Original Release Date
05/09/2013
Nominal Hours
40
Description
This unit covers the adjustment of a batch which has been manufactured to bring it into specification. It typically applies in batch plants where variability of materials leads to a variability in product which needs to be adjusted for.
Notes
Elements and Performance Criteria
1. Prepare for work.
- 1.1. Identify work requirements
- 1.2. Identify and control hazards
- 1.3. Coordinate with appropriate personnel
- 1.4. Take sample(s) as required.
2. Estimate required adjustment.
- 2.1. Interpret test results
- 2.2. Identify any conflicting results or suspicious results and take appropriate action
- 2.3. Identify required adjustment protocol for this adjustment
- 2.4. Estimate amount and type of materials to be added or other adjustments required
- 2.5. Estimate duration of this adjustment.
3. Make adjustment.
- 3.1. Obtain required materials for adjustment
- 3.2. Determine addition rate for materials/rate of applying adjustment
- 3.3. Make adjustment at the determined rate
- 3.4. Monitor the batch as the adjustment occurs
- 3.5. Take appropriate action.
4. Recheck batch
- 4.1. Repeat the adjustment process as required to bring batch to specification
- 4.2. Identify likely problems arising from adjustment process
- 4.3. Take appropriate action
RANGE STATEMENT
The Range Statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicized wording, if used in the Performance Criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs if the candidate, accessibility of the item, and local industry and regional contexts.
Codes of practice/ standards
Where reference is made to industry codes of practice, and/or Australian/international standards, the latest version must be used.
Context
This unit of competency includes all such items of equipment and unit operations which form part of the product manufacture/adjustment system. This may include (select relevant items):
kettle or mixing vessel
heating and or cooling
material addition equipment
pumps, valves and pipes
mixers
fume/vapour extraction
reflux systems
emergency shutdown systems
communications systems.
Adjustment protocol
Adjustment protocols may include:
aiming to make a '90% (or other%)adjustment' first time
aiming to 'hit the target' first time
under/overshoot the target
other techniques of achieving optimal adjustment.
Adjustments required
Adjustments required may include:
adding more of some of the original materials
adding some additional materials
continuing to heat/stir or otherwise process the batch (with or without material addition)
Likely problems from adjustment process
Likely problems from adjustment process include:
product deterioration from extended processing
kettle/vessel overflows from repeated material additions
misleading test results causing inappropriate adjustments
Appropriate action
Appropriate action includes:
determining problems needing action
determining possible fault causes
rectifying problem using appropriate solution within area of responsibility
following through items initiated until final resolution has occurred
reporting problems outside area of responsibility to designated person.
Procedures
Procedures may be written, verbal, computer-based or in some other form. They include:
all work instructions
standard operating procedures
formulas/recipes
batch sheets
temporary instructions
any similar instructions provided for the smooth running of the plant.
For the purposes of this Training Package, 'procedures' also includes good operating practice as may be defined by industry codes of practice (eg Responsible Care) and government regulations.
Health, safety and environment (HSE)
All operations to which this unit applies are subject to stringent health, safety and environment requirements, which may be imposed through State or Federal legislation, and these must not be compromised at any time. Where there is an apparent conflict between Performance Criteria and HSE requirements, the HSE requirements take precedence.
The Range Statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicized wording, if used in the Performance Criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs if the candidate, accessibility of the item, and local industry and regional contexts.
Codes of practice/ standards
Where reference is made to industry codes of practice, and/or Australian/international standards, the latest version must be used.
Context
This unit of competency includes all such items of equipment and unit operations which form part of the product manufacture/adjustment system. This may include (select relevant items):
kettle or mixing vessel
heating and or cooling
material addition equipment
pumps, valves and pipes
mixers
fume/vapour extraction
reflux systems
emergency shutdown systems
communications systems.
Adjustment protocol
Adjustment protocols may include:
aiming to make a '90% (or other%)adjustment' first time
aiming to 'hit the target' first time
under/overshoot the target
other techniques of achieving optimal adjustment.
Adjustments required
Adjustments required may include:
adding more of some of the original materials
adding some additional materials
continuing to heat/stir or otherwise process the batch (with or without material addition)
Likely problems from adjustment process
Likely problems from adjustment process include:
product deterioration from extended processing
kettle/vessel overflows from repeated material additions
misleading test results causing inappropriate adjustments
Appropriate action
Appropriate action includes:
determining problems needing action
determining possible fault causes
rectifying problem using appropriate solution within area of responsibility
following through items initiated until final resolution has occurred
reporting problems outside area of responsibility to designated person.
Procedures
Procedures may be written, verbal, computer-based or in some other form. They include:
all work instructions
standard operating procedures
formulas/recipes
batch sheets
temporary instructions
any similar instructions provided for the smooth running of the plant.
For the purposes of this Training Package, 'procedures' also includes good operating practice as may be defined by industry codes of practice (eg Responsible Care) and government regulations.
Health, safety and environment (HSE)
All operations to which this unit applies are subject to stringent health, safety and environment requirements, which may be imposed through State or Federal legislation, and these must not be compromised at any time. Where there is an apparent conflict between Performance Criteria and HSE requirements, the HSE requirements take precedence.
EVIDENCE GUIDE
The Evidence Guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Assessment of this unit should include demonstrated competence on actual plant and equipment in a work environment. The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency. Assessment will occur over a range of situations, which will include disruptions to normal, smooth operation.
Simulation may be required to allow for assessment of parts of this unit. Simulation should be based on the actual plant and will include walk-throughs of the relevant competency components. Simulations may also include the use of case studies/scenarios, role plays and 3D virtual reality interactive systems. In the case of evacuation training or of training for competencies practised in life-threatening situations, simulation may be used for the bulk of the training.
This unit of competency requires an application of the knowledge contained in the use of the process control system and its integral equipment, to the level needed to maintain control and recognise and resolve problems. This can be assessed through questioning and the use of what-if scenarios both on the plant (during demonstration of normal operations and walk throughs of abnormal operations) and off the plant.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate responses. The emphasis should be on the ability to stay out of trouble rather than on recovery from a disaster.
Consistent performance should be demonstrated. In particular look to see that:
estimates and protocols used are appropriate
potential problems are recognised and appropriate action taken
These aspects may be best assessed using a range of scenarios/case studies/what-ifs as the stimulus with a walk-through forming part of the response. These assessment activities should include a range of problems, including new, unusual and improbable situations, which may have been generated from the past incident history of the plant, incidents on similar plants around the world, hazard analysis activities and similar sources.
Context of and specific resources for assessment
Assessment will require access to a batch plant where adjustments are done over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations. A bank of scenarios/case studies/what-ifs will be required as will a bank of questions which will be used to probe the reasoning behind the observable actions.
Method of assessment
In all plants it may be appropriate to assess this unit concurrently with relevant teamwork and communication units.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the assessee and the work being performed.
The Evidence Guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Assessment of this unit should include demonstrated competence on actual plant and equipment in a work environment. The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency. Assessment will occur over a range of situations, which will include disruptions to normal, smooth operation.
Simulation may be required to allow for assessment of parts of this unit. Simulation should be based on the actual plant and will include walk-throughs of the relevant competency components. Simulations may also include the use of case studies/scenarios, role plays and 3D virtual reality interactive systems. In the case of evacuation training or of training for competencies practised in life-threatening situations, simulation may be used for the bulk of the training.
This unit of competency requires an application of the knowledge contained in the use of the process control system and its integral equipment, to the level needed to maintain control and recognise and resolve problems. This can be assessed through questioning and the use of what-if scenarios both on the plant (during demonstration of normal operations and walk throughs of abnormal operations) and off the plant.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate responses. The emphasis should be on the ability to stay out of trouble rather than on recovery from a disaster.
Consistent performance should be demonstrated. In particular look to see that:
estimates and protocols used are appropriate
potential problems are recognised and appropriate action taken
These aspects may be best assessed using a range of scenarios/case studies/what-ifs as the stimulus with a walk-through forming part of the response. These assessment activities should include a range of problems, including new, unusual and improbable situations, which may have been generated from the past incident history of the plant, incidents on similar plants around the world, hazard analysis activities and similar sources.
Context of and specific resources for assessment
Assessment will require access to a batch plant where adjustments are done over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations. A bank of scenarios/case studies/what-ifs will be required as will a bank of questions which will be used to probe the reasoning behind the observable actions.
Method of assessment
In all plants it may be appropriate to assess this unit concurrently with relevant teamwork and communication units.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the assessee and the work being performed.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AXN07 | PMAOPS319 | Adjust batch | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J572 | PMA30113 | Certificate III in Process Plant Operations | Qualification |
| W516 | PMA30108 | Certificate III in Process Plant Operations | Qualification |
| J571 | PMA40113 | Certificate IV in Process Plant Technology | Qualification |
| W517 | PMA40108 | Certificate IV in Process Plant Technology | Qualification |