Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Carry out levelling operations
Carry out levelling operations
Unit of competency
National Code
CPCCOM3006
CPCCOM3006
State Code
OCP15
OCP15
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040301 - Building Science And Technology
Original Release Date
01/06/2021
Nominal Hours
24
Description
This unit of competency specifies the skills and knowledge required to carry out levelling operations to establish correct and accurate set-out of buildings and components, meeting all relevant requirements of the National Construction Code (NCC), Australian Standards, work health and safety (WHS), and Commonwealth and state or territory legislation. It includes: using the rise and fall and height of collimation methodssetting up, testing and using levelling devicesundertaking closed and open traverses using a range of levelling equipment calculating distances using stadia lines.Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of CPCWHS1001Prepare to work safely in the construction industry meets this requirement.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan and prepare.
- 1.1 Read and interpret work instructions and plan sequence of work.
- 1.2 Plan all work to comply with laws and regulations, Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications, workplace requirements, drawings and specifications.
- 1.3 Select tools and equipment, including personal protective equipment (PPE), check for serviceability and report any faults.
- 1.4 Fit PPE correctly.
- 1.5 Inspect work site, assess hazards and services, and apply risk controls, including required signage and barricades.
- 1.6 Select materials required for task, calculate quantities, handle safely and prepare and position ready for use.
- 1.7 Confirm team roles and verbal and non-verbal communication signals.
2 Carry out levelling procedures using rise and fall method.
- 2.1 Set up and test instrument for operational effectiveness and accuracy.
- 2.2 Set up or locate datum point.
- 2.3 Take and record readings from the datum and at nominated or selected stations following project specifications.
- 2.4 Identify backsights, intermediate sights and foresights, and book levels.
- 2.5 Transfer instrument to another location, repeat process, and record change station and record readings.
- 2.6 Calculate reduced levels for all stations using rise and fall method, and check accuracy of recordings using the three-check method.
3 Carry out levelling procedures using height of collimation method.
- 3.1 Set up and test instrument for operational effectiveness and accuracy, and check tolerances.
- 3.2 Set up or locate datum point.
- 3.3 Take and record readings to datum and establish the height of collimation.
- 3.4 Take readings at nominated or selected stations following project specifications, and record in field book.
- 3.5 Transfer instrument to another location, establish new height of collimation, and record change station in field book.
- 3.6 Calculate reduced levels using height of instrument method.
- 3.7 Calculate reduced levels for all stations and record heights and levels in field book.
- 3.8 Check accuracy of readings using height of collimation method of calculation and three check method.
4 Calculate distances using stadia lines.
- 4.1 Calculate distances from instrument to stations using staff, stadia lines, and identified factor of levelling instrument
- 4.2 Record readings and distances.
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| BBB06 | CPCCCM3006 | Carry out levelling operations | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BCY47 | 52824WA | Certificate II in Building and Construction (Pathway - Trades) | Accredited course |
| BGS25 | 52893WA | Certificate II in Building and Construction (Pathway - Trades) | Accredited course |
| BGB8 | CPC30220 | Certificate III in Carpentry | Qualification |
| BGD2 | CPC30120 | Certificate III in Shopfitting | Qualification |
| AE390 | Work in Civil Construction Skill Set | Skill set |