Unit of competency Outline

Date retreived
22/07/2026 10:41 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Prepare and install architectural engineered leadlight and stained glass

Prepare and install architectural engineered leadlight and stained glass

Unit of competency
National Code
MSFDG3002
State Code
OAK03
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
03/12/2018
State Implementation and Classification
Approved Date
22/05/2019
Field of Education
040323 - Glazing
Original Release Date
22/05/2019
Nominal Hours
60
Description
This unit describes the skills and knowledge required to prepare and install leadlight and stained glass in structural and other architecturally engineered applications.This unit applies to individuals working with designed glass.Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking glass and glazing work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Notes
Elements and Performance Criteria
1. Identify work requirements
  • 1.1 Identify and follow work health and safety, legislative and organisational requirements
  • 1.2 Identify, confirm and clarify work requirements with appropriate personnel
  • 1.3 Identify the process for preparing and installing architecturally engineered leadlight and stained glass
2. Prepare for installation
  • 2.1 Determine work sequence in a logical order to suit the job
  • 2.2 Select and check tools, equipment and materials for suitability, serviceability and safety prior to use
  • 2.3 Check components of the leadlight and stained glass against specifications or job order
  • 2.4 Select leadlight and stained glass fixing method
  • 2.5 Prepare frame or opening to receive leadlight and stained glass using appropriate techniques
  • 2.6 Accurately measure and prepare fixing and sealing materials following manufacturer recommendations
3. Identify site conditions and constraints
  • 3.1 Recognise site safety hazards and take corrective action to reduce risk of injury to self and others
  • 3.2 Identify and address on-site difficulties in accordance with regulations and enterprise agreements
  • 3.3 Identify special characteristics of the leadlight and stained glass aperture in relation to the effect of the fitting process on the finished job
  • 3.4 Apply covering material to protect existing fixtures and fittings in accordance with workplace procedures
4. Fit leadlight and stained glass
  • 4.1 Fix leadlight and stained glass to the frame or opening using the selected method
  • 4.2 Apply solvents and sealants in accordance with manufacturer instructions
  • 4.3 Clean leadlight and stained glass and/or frame after fixing using appropriate cleaning agents
5. Finalise the installation
  • 5.1 Check completed installation to ensure compliance
  • 5.2 Check completed installation for compliance with customer requirements and specifications
  • 5.3 Clean and store tools, equipment and materials in accordance with workplace procedures
  • 5.4 Clean work area and leave in a safe condition and dispose of or recycle waste in accordance with workplace protocols
  • 5.5 Accurately complete required workplace documentation
No information
No information
Replaces
State Code National Code Title Type
WI647 MSFSL3004 Prepare and install architectural engineered leadlight and stained glass Unit of competency