Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Prepare surfaces for plastering
Prepare surfaces for plastering
Unit of competency
National Code
CPCCSP2003A
CPCCSP2003A
State Code
W9543
W9543
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
02/04/2014
Field of Education
040317 - Plastering
Original Release Date
02/04/2014
Nominal Hours
24
Description
This unit of competency specifies the outcomes required to prepare surfaces to accept a new skin of lining materials.It includes planning and preparation for work, producing a level and plumb surface through sanding and grinding, patching, levelling, packing, filling and finishing, and post work clean-up.
Notes
Elements and Performance Criteria
1. Plan and prepare.
- 1.1. Work instructions, including plans, specifications, quality requirements and operational details are obtained from relevant information, confirmed and applied to the scope of work performed.
- 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
- 1.3. Signage and barricade requirements are identified and implemented.
- 1.4. Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
- 1.5. Materials quantity requirements are calculated in accordance with plans, specifications and quality requirements.
- 1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- 1.7. Environmental requirements are identified for the project in accordance with environmental plans and statutory and legislative authority obligations and applied.
2. Prepare surface.
- 2.1. Preparation requirements are identified from site inspection, plans and specifications.
- 2.2. Hazards, obstructions and attachments are removed, or arrangements made for their removal.
- 2.3. Surface preparation tools are selected and set up in accordance with surface condition and job requirements.
- 2.4. Tools are used to prepare surface in accordance with manufacturer specifications and job requirements.
- 2.5. Loose or protruding material is removed by sander or grinder and brush so that surface is prepared to specification.
3. Patch and fill holes and depressions.
- 3.1. Patching method of hole is determined from type of material surface, size of hole, compatibility of materials and planned finish.
- 3.2. Patching materials are selected to suit material surface and are mixed to manufacturer specifications.
- 3.3. Material is applied to manufacturer specifications using appropriate application method.
- 3.4. Surface is brushed, washed and scraped clean of surplus material in accordance with type of patching material and material surface.
- 3.5. Patched areas are sealed by application of prime or sealing coat, to suit requirements of specified finishes.
4. Clean up.
- 4.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
- 4.2. Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to the preparation of surfaces for plastering
relevant Australian standards
safe work procedures relating to the preparation of surfaces for plastering
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Scope of work:
surface preparations include preparation for solid plastering and sheet plastering or lining material, and may include pre-cast cladding
surfaces may include timber, plasterboard and plasterglass, masonry, brick, metal (ferrous and non-ferrous), concrete and solid plaster.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as a disability are a factor
hazard control
hazardous materials and substances, including cement and curing agents
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
lighting
power equipment
power leads and sources
trip hazards
work site visitors and the public
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment:
include:
brooms
brushes
buckets
chisels
filling blades
hammers
power grinders
power sanders
sanding blocks
scrapers
shovels
sponges
trowels
may include:
elevated work platforms
hoses
ladders
planks
trestles
water sprayers.
Materials include:
caulking compounds
cellulose and plaster
lime putty
plaster
proprietary fillers
sand and cement
sheet material.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications
workplace operations and procedures.
Environmental requirements include:
clean-up management
dust and noise
stormwater protection
vibration
waste management.
Statutory and regulatory authorities include:
federal, state and local authorities administering the applicable Acts, regulations and codes of practice.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to the preparation of surfaces for plastering
relevant Australian standards
safe work procedures relating to the preparation of surfaces for plastering
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Scope of work:
surface preparations include preparation for solid plastering and sheet plastering or lining material, and may include pre-cast cladding
surfaces may include timber, plasterboard and plasterglass, masonry, brick, metal (ferrous and non-ferrous), concrete and solid plaster.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as a disability are a factor
hazard control
hazardous materials and substances, including cement and curing agents
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
lighting
power equipment
power leads and sources
trip hazards
work site visitors and the public
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment:
include:
brooms
brushes
buckets
chisels
filling blades
hammers
power grinders
power sanders
sanding blocks
scrapers
shovels
sponges
trowels
may include:
elevated work platforms
hoses
ladders
planks
trestles
water sprayers.
Materials include:
caulking compounds
cellulose and plaster
lime putty
plaster
proprietary fillers
sand and cement
sheet material.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications
workplace operations and procedures.
Environmental requirements include:
clean-up management
dust and noise
stormwater protection
vibration
waste management.
Statutory and regulatory authorities include:
federal, state and local authorities administering the applicable Acts, regulations and codes of practice.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply of relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
safely and effectively use tools and equipment
communicate and work effectively and safely with others
prepare surfaces for plastering for either solid plastering (masonry or concrete) or sheet plastering (timber, steel or masonry) including:
both wall and ceiling surfaces to a level and plumb surface finish
patching or filling holes and depressions.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply of relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
safely and effectively use tools and equipment
communicate and work effectively and safely with others
prepare surfaces for plastering for either solid plastering (masonry or concrete) or sheet plastering (timber, steel or masonry) including:
both wall and ceiling surfaces to a level and plumb surface finish
patching or filling holes and depressions.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W1895 | BCGSP2003B | Prepare surfaces for plastering | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCP71 | CPCCSP2003 | Prepare surfaces for plastering | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| 1599 | 52443WA | Certificate II in Building and Construction (Pathway - Trades) | Accredited course |
| W569 | CPC20108 | Certificate II in Construction | Qualification |
| D382 | CPC20111 | Certificate II in Construction | Qualification |
| D383 | CPC20211 | Certificate II in Construction Pathways | Qualification |
| 3719 | 52661WA | Certificate III in Plastering (Housing) | Accredited course |
| 1475 | 52211 | Certificate III in Plastering (Housing) | Accredited course |
| W586 | CPC31008 | Certificate III in Solid Plastering | Qualification |
| D399 | CPC31011 | Certificate III in Solid Plastering | Qualification |