Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Perform dogging
Perform dogging
Unit of competency
National Code
RIIHAN208D
RIIHAN208D
State Code
WH302
WH302
TGA Status
Replaced
Replaced
DTWD Status
Transition (Replaced)
Transition (Replaced)
State Implementation and Classification
Approved Date
29/05/2014
Field of Education
040399 - Building, N.e.c.
Original Release Date
29/05/2014
Nominal Hours
40
Description
This unit describes the skills and knowledge required to perform dogging, including planning for dogging, preparing dogging equipment and moving loads.This unit is appropriate for those working in site-based roles.The work required in this unit relates to the National Standard for High Risk Work but this unit does not provide the licence. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories and industry sectors and must be sourced prior to applying this unit.
Notes
Elements and Performance Criteria
1. Plan and prepare for dogging
- 1.1 Access, interpret and apply dogging compliance documentation and ensure the work activity is compliant
- 1.2 Obtain, read, interpret, clarify and confirm work requirements and safety information before proceeding
- 1.3 Select and wear personal protective equipment appropriate for work activities
- 1.4 Develop a preliminary dogging plan and site sketch considering essential information
- 1.5 Check and confirm job feasibility and schedule with the load designer and other relevant persons
- 1.6 Confirm hazards associated with the use of cranes and other load moving equipment, and identify and review measures to eliminate or control these hazards with appropriate parties
- 1.7 Finalise and confirm dogging plan, including the scheduling of required resources
- 1.8 Identify and implement signage and/or barricading requirements
2. Prepare dogging equipment
- 2.1 Identify, select, inspect, and verify as serviceable dogging equipment, materials and tools required for the plan
- 2.2 Label for repair or disposal unserviceable equipment, materials and tools
- 2.3 Communicate and coordinate job sequencing schedule with team
- 2.4 Calculate load mass and centre of gravity using load charts and standard calculations
- 2.5 Calculate load in slings and equipment to suit job requirements
3. Move loads
- 3.1 Perform load moving in accordance with the plan and acceptable safe work practices, standards and codes and specifications
- 3.2 Perform work safely at heights, within uncompleted structures and/or in confined and enclosed spaces
- 3.3 Connect lifting gear to load
- 3.4 Connect load to movement device using appropriate and certified equipment in accordance with relevant standards
- 3.5 Ensure stability of the load by application of load movement procedure, temporary bracing and/or load support appropriate to the task
- 3.6 Follow appropriate designer’s specifications during the placement and securing of the load
- 3.7 Direct load to landing position using communication compliant with Australian standards and site procedures
4. Clean up
- 4.1 Dismantle and inspect load shifting equipment
- 4.2 Clear work area of materials by disposing, reusing or recycling
- 4.3 Check, clean, maintain and store tools and equipment
- 4.4 Apply work completion procedures, notify personnel of work completion
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WB604 | RIIHAN208A | Perform dogging | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OBW77 | RIIHAN208E | Perform dogging | Unit of competency |