Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install products on and off site
Install products on and off site
Unit of competency
National Code
MSTTF2015
MSTTF2015
State Code
BAU54
BAU54
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
01/12/2016
Field of Education
040319 - Furnishing Installation
Original Release Date
01/12/2016
Nominal Hours
40
Description
This unit of competency covers the skills and knowledge required to install canvas and sail products both on site and off site.The unit of competency applies to the installation, operation and maintenance of canvas and sail products and equipment both on and off site. Work may be conducted in a variety of environments, such as operational indoor, outdoor workplaces or on siteWork may require independence, discretion, judgement and acceptance of responsibility for overall work outcomes. Work may involve planning and coordination of tasks and processes, interaction with other enterprise personnel, enterprise clients, manufacturer representatives and other external personnel.Work may be conducted in small to large scale enterprises and may involve individual and team activities. No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Determine job requirements
- 1.1 Follow standard operating procedures (SOPs)
- 1.2 Comply with work health and safety (WHS) requirements at all times
- 1.3 Use appropriate personal protective equipment (PPE) in accordance with SOPs
- 1.4 Identify job requirements from specifications, drawings, job sheets or work instructions
2 Prepare for installation
- 2.1 Read and interpret workplace procedures and instructions, including interpreting drawings and technical information to guide installation
- 2.2 Plan task operation sequence, identify suitable electrical power outlets and equipment to work above ground, as required
- 2.3 Arrange additional assistance, if required
- 2.4 Select and prepare appropriate tools and prepare site
3 Prepare to work above ground
- 3.1 Select, secure and adequately support ladders or other devices, such as steps or bosun's chair, as required for the tasks
- 3.2 Erect appropriate barriers and signs when working overhead
- 3.3 Obtain assistance, as necessary, when working above the ground or deck
4 Fit products
- 4.1 Use appropriate marking tools and measuring equipment to mark out fitting positions
- 4.2 Check products to be installed to ensure they meet specifications and are fit for their intended purpose
- 4.3 Use appropriate ladders or other devices to gain height advantage
- 4.4 Sequence all operations according to specifications and workplace procedures ,as required, to complete a normal installation
- 4.5 Apply appropriate WHS precautions and environmental practices during all phases of the installation
- 4.6 Work in cooperation with other team members, as required, to fit products
5 Inspect and check quality
- 5.1 Inspect completed work to verify that the products and installation work meet job specifications and relevant workplace and industry quality standards
- 5.2 Check that installation is correct, and that products fit and operate correctly
- 5.3 Determine if any re-work or rectification is required, undertake re-work or take other appropriate action
6 Provide customer information and finalise work
- 6.1 Supply customer with information on how to use product, as required
- 6.2 Demonstrate product to customer and answer questions within scope of own responsibility
- 6.3 Clean work area, clean and return tools to safe storage, and perform normal basic maintenance, in accordance with workplace procedures
- 6.4 Clean and stow away ladders, bosun's chair or other equipment
- 6.5 Complete project documentation and obtain customer signature, if required
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W7474 | LMTTF2016A | Install products on and off site | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OEZ26 | MSTTF3014 | Install manufactured textile products | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGB0 | AUR32320 | Certificate III in Automotive and Marine Trimming Technology | Qualification |
| BAG4 | AUR32316 | Certificate III in Automotive and Marine Trimming Technology | Qualification |
| BFC0 | MSF30919 | Certificate III in Blinds, Awnings, Security Screens and Grilles | Qualification |
| J737 | MSF30913 | Certificate III in Blinds, Awnings, Security Screens and Grilles | Qualification |
| J725 | MSF20113 | Certificate II in Furnishing | Qualification |
| BIJ6 | MSF20122 | Certificate II in Furnishing | Qualification |
| BDF6 | MST20216 | Certificate II in TCF Production Operations | Qualification |