Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Construct ceiling frames
Construct ceiling frames
Unit of competency
National Code
CPCCCA3005B
CPCCCA3005B
State Code
WE976
WE976
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
02/04/2014
Field of Education
040311 - Carpentry And Joinery
Original Release Date
02/04/2014
Nominal Hours
24
Description
This unit of competency specifies the outcomes required to plan, prepare, set out, construct and erect ceiling frames to accommodate ceiling joists, hanging beams, strutting beams and composite beams. It includes selection of members and setting out of the ceiling frame in conjunction with the roof members.
Notes
Elements and Performance Criteria
1 Plan and prepare.
- 1.1 Work instructions, including plans, specifications, quality requirements and operational details are obtained for planning the work and confirmed and applied from relevant information.
- 1.2 Safety (OHS)requirements are followed in accordance with safety plans and policies.
- 1.3 Signage and barricade requirements are identified and implemented.
- 1.4 Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement.
- 1.5 Material quantity and quality requirements are calculated in accordance with plans and specifications.
- 1.6 Materialsappropriate to construction of ceiling frames, including fire resistance ratings are identified, obtained, prepared, safely handled and located ready for use.
- 1.7 Environmental requirementsare identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied.
- 1.8 Passive and active fire control elements for ceiling frame construction and installation are identified and applied.
2 Locate ceiling joists.
- 2.1 Ceiling frame componentsare identified and selected in accordance with regulatory criteria.
- 2.2 Location of ceiling joists are set out on the top plate to specifications for spacings of roof and ceiling members.
- 2.3 Ceiling joists and trimmers are cut to length, placed and securely fixed to locations in accordance with specifications.
3 Install hanging beams.
- 3.1 Hanging beam sizes and spacings are checked in accordance with regulatory criteria.
- 3.2 Hanging beamsare installed.
- 3.3 Hanging beams on external walls are placed alongside rafter locations where specified.
- 3.4 Ceiling joists are connected using appropriate connecting methods to hanging beams.
4 Clean up.
- 4.1 Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
- 4.2 Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Planning includes:
work site inspection
equipment defect identification
assessment of conditions and hazards
determination of work requirements.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions where specified
memos
MSDS
organisation work specifications and requirements
plans and specifications
regulatory and legislative requirements pertaining to constructing ceiling frames
relevant Australian standards
safe work procedures related to constructing ceiling frames
signage
verbal or written and graphical instructions
work bulletins
work schedules.
Safety (OHS) is to be in accordance with state or territory legislation, regulations, codes of practice, organisational safety policies and procedures, and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling of materials
hazard control
hazardous materials and substances
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
photovoltaic (solar) panels
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
working with dangerous materials
organisational first aid
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
use of firefighting equipment
use of tools and equipment
workplace environment and safety.
Tools and equipment include:
air compressors and hoses
chisels
hammers
hand saws
marking equipment
measuring tapes and rules
nail bags
nail guns
power drills
power leads
power saws
roofing square
saw stools
scaffolding
spirit levels
squares (combination/tri)
string lines.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications, where specified
workplace operations and procedures.
Materials include:
bolts
metal
nails
patented fasteners
reconstituted timber products
screws
synthetic materials
timber.
Construction of ceiling frames:
is to be completed in conjunction with the roof members
methods include ensuring compliance with incipient spread of fire requirements
selection of hangers and composite beams will be determined by the building geometry and roof pitch.
Environmental requirements include:
clean-up protection
noise and dust
vibration
waste management.
Statutory and regulatory authorities include:
federal, state and local authorities administering applicable Acts, regulations and codes of practice.
Ceiling frame components include:
synthetic materials
timber and metal components.
Hanging beams include:
ceiling frame bracing, which may be included where high wind loadings are specified
hanging beams with end bearing, which are to be positioned so that full load distribution to the supporting wall frame is achieved
installation, which may be incorporated with strutting and/or composite beams.
Connecting methods include:
metal straps
patented connectors
timber cleats.
Planning includes:
work site inspection
equipment defect identification
assessment of conditions and hazards
determination of work requirements.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions where specified
memos
MSDS
organisation work specifications and requirements
plans and specifications
regulatory and legislative requirements pertaining to constructing ceiling frames
relevant Australian standards
safe work procedures related to constructing ceiling frames
signage
verbal or written and graphical instructions
work bulletins
work schedules.
Safety (OHS) is to be in accordance with state or territory legislation, regulations, codes of practice, organisational safety policies and procedures, and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling of materials
hazard control
hazardous materials and substances
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
photovoltaic (solar) panels
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
working with dangerous materials
organisational first aid
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
use of firefighting equipment
use of tools and equipment
workplace environment and safety.
Tools and equipment include:
air compressors and hoses
chisels
hammers
hand saws
marking equipment
measuring tapes and rules
nail bags
nail guns
power drills
power leads
power saws
roofing square
saw stools
scaffolding
spirit levels
squares (combination/tri)
string lines.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications, where specified
workplace operations and procedures.
Materials include:
bolts
metal
nails
patented fasteners
reconstituted timber products
screws
synthetic materials
timber.
Construction of ceiling frames:
is to be completed in conjunction with the roof members
methods include ensuring compliance with incipient spread of fire requirements
selection of hangers and composite beams will be determined by the building geometry and roof pitch.
Environmental requirements include:
clean-up protection
noise and dust
vibration
waste management.
Statutory and regulatory authorities include:
federal, state and local authorities administering applicable Acts, regulations and codes of practice.
Ceiling frame components include:
synthetic materials
timber and metal components.
Hanging beams include:
ceiling frame bracing, which may be included where high wind loadings are specified
hanging beams with end bearing, which are to be positioned so that full load distribution to the supporting wall frame is achieved
installation, which may be incorporated with strutting and/or composite beams.
Connecting methods include:
metal straps
patented connectors
timber cleats.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan, OHS regulations and state and territory legislation applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
safely and effectively use tools, plant and equipment
communicate and work effectively and safely with others
set out, construct and erect a ceiling incorporating a hanging beam, ceiling trimmers and strutting beam to specifications for a full size one bedroom home or equivalent (includes a bedroom, lounge, kitchen and bathroom not less than 30 square metres)
complete construction tasks involving both timber and metal materials and components
ensure correct selection and use of fire-rated materials and methods of construction.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan, OHS regulations and state and territory legislation applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
safely and effectively use tools, plant and equipment
communicate and work effectively and safely with others
set out, construct and erect a ceiling incorporating a hanging beam, ceiling trimmers and strutting beam to specifications for a full size one bedroom home or equivalent (includes a bedroom, lounge, kitchen and bathroom not less than 30 square metres)
complete construction tasks involving both timber and metal materials and components
ensure correct selection and use of fire-rated materials and methods of construction.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W9344 | CPCCCA3005A | Construct ceiling frames | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCM76 | CPCCCA3005 | Construct ceiling frames | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| D391 | CPC30211 | Certificate III in Carpentry | Qualification |
| 3722 | 52662WA | Certificate III in Carpentry (Housing) | Accredited course |
| D409 | CPC32011 | Certificate III in Carpentry and Joinery | Qualification |
| 3723 | 52663WA | Certificate III in Steel Framing (Housing) | Accredited course |