Unit of competency Outline

Date retreived
24/07/2026 7:35 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Test train braking system

Test train braking system

Unit of competency
National Code
TLIB3019
State Code
AVK59
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
22/11/2021
State Implementation and Classification
Approved Date
23/02/2016
Field of Education
039907 - Rail Operations
Original Release Date
23/02/2016
Nominal Hours
30
Description
This unit involves the skills and knowledge required to test a train braking system in accordance with workplace procedures, safeworking rules, regulations and codes of practice. It includes planning and preparing for, and testing train brake operation; dealing with identified faults; and recording brake test results in accordance with workplace requirements.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.Work is performed without supervision, generally within a team environment. Testing train braking system can involve:air continuity testbrake leakage testhose and pipe components repair or replacement modified brake testtrain brake test.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan and prepare for train brake inspection and testing
  • 1.1 Brake test documentation, rolling stock data and other relevant reports are read and clarified, as required, to confirm required action
  • 1.2 Appropriate equipment is obtained, as required, and checked prior to inspection
  • 1.3 Work health and safety (WHS)/occupational health and safety (OHS) legislation, codes of practice, policies and procedures are identified and followed
  • 1.4 Hazards are identified, risks are assessed and risk control measures are implemented
  • 1.5 Train is isolated or secured in accordance with workplace procedures to make the work area safe for inspection
2 Inspect and test train brake operation
  • 2.1 Brake leakage test is conducted to ensure compliance with required standards
  • 2.2 Modified brake tests are conducted to ensure compliance with required rail network standards
  • 2.3 Air continuity test is conducted to ensure train braking system meets functional specifications
  • 2.4 Brakes are applied and released to ensure train braking system meets functional specifications
  • 2.5 Hoses and pipe components are inspected for defects requiring repair or replacement
  • 2.6 Defects and faults are identified, reported and appropriate actions are taken in accordance with workplace procedures
3 Deal with identified faults
  • 3.1 Plans and/or procedures for replacement or repair of identified defective components are implemented in accordance with workplace procedures and manufacturer specifications
  • 3.2 Confirmation/verification of minor repairs or replacements is obtained
  • 3.3 Defective rolling stock not fit to run is identified and detachment arrangements are made in compliance with workplace procedures
4 Record test results
  • 4.1 Brake test records are completed to reflect inspection results in accordance with workplace policies and procedures
  • 4.2 Records are filed in accordance with workplace policies and procedures
No information
No information
Replaces
State Code National Code Title Type
WI790 TLIB3019B Test train braking system Unit of competency