Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Interpret process plant schematics

Interpret process plant schematics

Unit of competency
National Code
PMAOPS280
State Code
AXN19
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
02/06/2016
State Implementation and Classification
Approved Date
05/08/2016
Field of Education
030703 - Industrial Engineering
Original Release Date
05/08/2016
Nominal Hours
20
Description
This unit of competency covers the skills and knowledge required to interpret process plant schematics for a range of operations uses. This unit of competency applies to operators who are required to find specific information from a schematic, mark up a schematic for their own or someone else’s use, and sketch a schematic using relevant symbols as part of an explanation to another person or as an aide memoir for themselves.This unit of competency applies to a wide range of schematics and covers all general and common symbols. It also includes those specific to the plant which is the operator's area of responsibility and any conventions which are applied by the organisation.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Relate schematic to plant
  • 1.1 Match items on schematic with items in plant
  • 1.2 Determine relevant pipe and flange schedules
  • 1.3 Identify sizes and types of minor equipment
  • 1.4 Locate relevant instrument tapping points and control points
  • 1.5 Identify direction of flow on schematic and in plant
2 Identify points required to prepare plant
  • 2.1 Locate isolation and blanking points for any item of the relevant schematic
  • 2.2 Identify drain/vent/purge points for any item on the relevant schematic
  • 2.3 Identify trip system elements
  • 2.4 Use schematic to check/develop work lists
3 Describe the process with a schematic
  • 3.1 Use a schematic as the basis of a description of the process
  • 3.2 Describe the process using a manual schematic
  • 3.3 Walk through process identifying all plant items in process order
  • 3.4 Identify key conditions/variables from a relevant schematic
No information
No information
Replaces
State Code National Code Title Type
WC255 PMAOPS280B Interpret process plant schematics Unit of competency