Unit of competency Outline
Date retreived
22/07/2026 10:06 PM AWST
22/07/2026 10:06 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Set up/pack up drill site
Set up/pack up drill site
Unit of competency
National Code
RIINHB202D
RIINHB202D
State Code
WH457
WH457
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
29/05/2014
Field of Education
030303 - Mining Engineering
Original Release Date
29/05/2014
Nominal Hours
40
Description
This unit describes a participant’s skills and knowledge required to set up/pack up drill site in the Resources and Infrastructure Industries.This unit is appropriate for those working in drillers assistant and driller roles. No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Plan and prepare for setting up and packing up of drill sites
- 1.1 Access, interpret and apply set up/pack up drill site documentation and ensure the work activity complies
- 1.2 Obtain, read, interpret, clarify and confirm work requirements
- 1.3 Identify and address potential risks, hazards and environmental issues and implement control measures
- 1.4 Select and wear personal protective equipment appropriate for work activities
- 1.5 Communicate and coordinate activities with others throughout the work activity
- 1.6 Test the working order of required safety equipment
- 1.7 Erect and observe warning signs and barriers
- 1.8 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
- 1.9 Store materials to minimise hazards and contamination
2. Assist driller to set up drill rig
- 2.1 Carry out the instructions on work scheduling in logical sequence
- 2.2 Assist unloading rig and equipment and ensure no damage
- 2.3 Set out required tools and/or equipment
- 2.4 Take appropriate weather precautions for equipment and stores
3. Set up and dismantle ancillary equipment
- 3.1 Set up and dismantle ancillary equipment
- 3.2 Provide connecting services to and from equipment
- 3.3 Carry out pre-start checks and shutdown procedures
4. Pack up drill site
- 4.1 Complete site housekeeping
- 4.2 Load and secure equipment as directed
- 4.3 Remove waste and unwanted materials from site
- 4.4 Clean, maintain and store tools and equipment
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WB164 | RIINHB202A | Set up/pack up drill site | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OBV75 | RIINHB202E | Set up and pack up drill sites | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGO44 | 52845WA | Certificate II in Autonomous Workplace Operations | Accredited course |
| AZE0 | RII31215 | Certificate III in Civil Foundations | Qualification |
| J634 | RII31213 | Certificate III in Civil Foundations | Qualification |
| AZE4 | RII20915 | Certificate II in Drilling Operations | Qualification |
| J685 | RII20913 | Certificate II in Drilling Operations | Qualification |