Unit of competency Outline
Date retreived
22/07/2026 7:06 PM AWST
22/07/2026 7:06 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Lay pipes
Lay pipes
Unit of competency
National Code
RIICRC208A
RIICRC208A
State Code
WB434
WB434
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
20/01/2010
Field of Education
030907 - Water And Sanitary Engineering
Original Release Date
20/01/2010
Nominal Hours
32
Description
This unit covers the laying of pipes in the civil construction industry. It includes planning and preparing, setting out excavations, installing bedding materials, laying pipes, and cleaning up. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare
- 1.1. Access, interpret and apply compliance documentation relevant to the work activity
- 1.2. Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task
- 1.3. Identify, obtain and implement signage requirements from the project traffic management plan
- 1.4. Select tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults
- 1.5. Identify, confirm and apply environmental protection requirements from the project environmental management plan
2. Set out excavation
- 2.1. Determine location and depths of excavation from job drawings
- 2.2. Set out and clearly mark excavation location
- 2.3. Advise plant operator of excavation requirements
- 2.4. Check excavation depths and grades for conformity to job requirements
- 2.5. Compact and prepare foundation base for testing
3. Install bedding materials
- 3.1. Determine bedding material type and specification from plans and drawings
- 3.2. Lay and compact bedding materials to specified depths and grades
4. Lay pipe
- 4.1. Select, check and attach lifting apparatus to the pipe in preparation for lifting and installation for pipe joining
- 4.2. Prepare and specify pipe ends
- 4.3. Align pipe ends and push home
- 4.4. Check pipe for line and level
- 4.5. Advise plant operator of backfilling requirements and backfill and compact pipe to required finish level
- 4.6. Finish inlets and outlets in accordance with pipe/culvert design specifications
5. Clean up
- 5.1. Clear work area and dispose of or recycle materials in accordance with project environmental management plan
- 5.2. Clean, check, maintain and store tools and equipment
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Relevant compliance documentation may include:
legislative, organisational and site requirements and procedures
plans, specifications and drawings
manufacturer's guidelines and specifications
Australian Standards
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Safety requirements may include:
OHS requirements in accordance with state or territory legislation and regulations, organisational safety policies and procedures, and project safety plan, including protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of First Aid equipment, hazard control and hazardous materials and substances
safe operating procedures including recognising and preventing hazards associated with underground and overhead services, other machines, personnel, restricted access barriers, traffic control, working at heights, working in proximity to others, worksite visitors and the public
recognising hazards and risks including uneven/unstable terrain, trees, fires, overhead and underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials
emergency procedures including emergency shutdown and stopping, organisational First Aid requirements and evacuation
safe parking practices including ensuring access ways are clear, equipment/machinery is away from overhangs and refuelling sites, safe distances from excavations are kept, and areas secured from unauthorised access or movement
Site may include:
any ground conditions in urban and rural areas
Signage may include:
escort vehicle
highway traffic signs
site safety signage
temporary signage for the benefit of motorists and pedestrians
barricades
traffic conditions signage
Traffic conditions may include:
congested urban environments
low traffic rural areas
off-road un-trafficked areas
buildings
parking sites
pedestrian areas
Tools and equipment may include:
levelling equipment
shovels
lifting equipment
crow bars
hammers
grinders
jointing equipment
oxy-acetylene equipment
scaffolding
saws
Environmental protection requirements may include:
organisational/project environmental management plan
waste management
water quality protection
noise
vibration
dust and clean-up management
Bedding materials may include:
aggregate and sand
Pipe may include:
pipes used in the construction of road stormwater systems
pipes used in the construction of road culverts
concrete (RCP)
steel
fibre reinforced concrete (FRC)
ribbed PVC
Installation procedures may include:
selecting size, type and material of pipes
bedding down pipes
positioning pipes
checking alignment, level and grade
fitting inlets and outlets
repair work where required
Pipe joining may include:
sand band
rubber ring
mechanical jointed
Materials may include:
marking materials
pipes
concrete
backfill materials
bedding materials
Relevant compliance documentation may include:
legislative, organisational and site requirements and procedures
plans, specifications and drawings
manufacturer's guidelines and specifications
Australian Standards
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Safety requirements may include:
OHS requirements in accordance with state or territory legislation and regulations, organisational safety policies and procedures, and project safety plan, including protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of First Aid equipment, hazard control and hazardous materials and substances
safe operating procedures including recognising and preventing hazards associated with underground and overhead services, other machines, personnel, restricted access barriers, traffic control, working at heights, working in proximity to others, worksite visitors and the public
recognising hazards and risks including uneven/unstable terrain, trees, fires, overhead and underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials
emergency procedures including emergency shutdown and stopping, organisational First Aid requirements and evacuation
safe parking practices including ensuring access ways are clear, equipment/machinery is away from overhangs and refuelling sites, safe distances from excavations are kept, and areas secured from unauthorised access or movement
Site may include:
any ground conditions in urban and rural areas
Signage may include:
escort vehicle
highway traffic signs
site safety signage
temporary signage for the benefit of motorists and pedestrians
barricades
traffic conditions signage
Traffic conditions may include:
congested urban environments
low traffic rural areas
off-road un-trafficked areas
buildings
parking sites
pedestrian areas
Tools and equipment may include:
levelling equipment
shovels
lifting equipment
crow bars
hammers
grinders
jointing equipment
oxy-acetylene equipment
scaffolding
saws
Environmental protection requirements may include:
organisational/project environmental management plan
waste management
water quality protection
noise
vibration
dust and clean-up management
Bedding materials may include:
aggregate and sand
Pipe may include:
pipes used in the construction of road stormwater systems
pipes used in the construction of road culverts
concrete (RCP)
steel
fibre reinforced concrete (FRC)
ribbed PVC
Installation procedures may include:
selecting size, type and material of pipes
bedding down pipes
positioning pipes
checking alignment, level and grade
fitting inlets and outlets
repair work where required
Pipe joining may include:
sand band
rubber ring
mechanical jointed
Materials may include:
marking materials
pipes
concrete
backfill materials
bedding materials
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for laying pipes
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of pipe laying
working with others to undertake and complete the laying of pipes that meets all of the required outcomes
consistent timely completion of pipe laying that safely, effectively and efficiently meets the required outcomes
installation of pipe on two different projects to a minimum of ten pipe joints listed in the Unit Scope: the pipes are to have a minimum diameter of DN225 mm
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistent achievement of required outcomes
first hand testimonial evidence of the candidate's:
working with others to undertake and complete the laying of pipes
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for laying pipes
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of pipe laying
working with others to undertake and complete the laying of pipes that meets all of the required outcomes
consistent timely completion of pipe laying that safely, effectively and efficiently meets the required outcomes
installation of pipe on two different projects to a minimum of ten pipe joints listed in the Unit Scope: the pipes are to have a minimum diameter of DN225 mm
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistent achievement of required outcomes
first hand testimonial evidence of the candidate's:
working with others to undertake and complete the laying of pipes
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W2105 | BCCRC2008B | Lay pipes | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH115 | RIICRC208D | Lay pipes | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W984 | SFI20111 | Certificate II in Aquaculture | Qualification |
| W672 | RII30809 | Certificate III in Civil Construction Plant Operations | Qualification |
| W677 | RII31309 | Certificate III in Pipe Laying | Qualification |
| W680 | RII31609 | Certificate III in Trenchless Technology | Qualification |