Unit of competency Outline

Date retreived
23/07/2026 4:45 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Lay pipes

Lay pipes

Unit of competency
National Code
RIICRC208D
State Code
WH115
TGA Status
Replaced
DTWD Status
Transition (Replaced)
Current Release Number
3.00
Current Release Date
14/12/2015
State Implementation and Classification
Approved Date
29/05/2014
Field of Education
040327 - Plumbing
Original Release Date
29/05/2014
Nominal Hours
32
Description
This unit describes a participant’s skills and knowledge required to lay pipes in Civil Construction.This unit is appropriate for those working in operational roles.Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and Industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare to lay pipes
  • 1.1 Access, interpret and apply pipe laying documentation and ensure the work activity is compliant
  • 1.2 Obtain, read, interpret, clarify and confirm work requirements
  • 1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures
  • 1.4 Select and wear correct personal protective equipment appropriate for work activities
  • 1.5 Identify, obtain, confirm and implement signage requirements
  • 1.6 Select and check for faults all plant, tools and equipment to carry out tasks
  • 1.7 Survey work area for loading and unloading and stock-piling materials
2. Set out excavation
  • 2.1 Determine location and depths of excavation from job drawings
  • 2.2 Set out and clearly mark excavation location
  • 2.3 Advise plant operator of excavation requirements
  • 2.4 Check excavation depths and grades for conformity to job requirements
  • 2.5 Compact and prepare foundation base for testing
3. Install bedding materials
  • 3.1 Determine bedding material type and specification from plans and drawings
  • 3.2 Lay and compact bedding materials to specified depths and grades
4. Lay pipe
  • 4.1 Select, check and attach lifting apparatus to the pipe in preparation for lifting and installation for pipe joining
  • 4.2 Prepare and specify pipe ends
  • 4.3 Align pipe ends and push home
  • 4.4 Check pipe for line and level
  • 4.5 Advise plant operator of backfilling requirements and backfill and compact pipe to required finish level
  • 4.6 Finish inlets and outlets in accordance with pipe/culvert design specifications
5. Clean up
  • 5.1 Clear work area and dispose of or recycle materials
  • 5.2 Clean, check, maintain and store tools and equipment
No information
No information
Replaces
State Code National Code Title Type
WB434 RIICRC208A Lay pipes Unit of competency
Replaced By
State Code National Code Title Type
OCX32 RIICRC208E Lay pipes Unit of competency