Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Conduct train roll-by inspection

Conduct train roll-by inspection

Unit of competency
National Code
TLIB3021
State Code
AVK58
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
22/11/2021
State Implementation and Classification
Approved Date
23/02/2016
Field of Education
039907 - Rail Operations
Original Release Date
23/02/2016
Nominal Hours
20
Description
This unit involves the skills and knowledge required to conduct a train roll-by inspection in accordance with workplace procedures and the requirements of relevant system of safeworking, rules, regulations and codes of practice.It includes preparing to carry out a roll-by inspection of a moving train, inspecting a moving train in accordance with workplace procedures, and reporting and/or actioning inspection results.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.Work is performed without supervision, generally within a team environment. It involves the application of operational principles, regulations, system of safeworking, codes, protocols and procedures when conducting a roll-by inspection of a moving train, as part of workplace activities across a variety of operational contexts within the Australian rail industry.Inspecting condition of rolling stock and load may involve:air and electrical connectionsbearingsbrake equipmentdangerous goods condition and separationdraw gearload condition (damage and leaks)load securing devices (chains, ropes and pins)locking and securing devicesout-of-gauge conditionssuperstructurestrailing items (ropes and hoses)wheels.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare for train roll-by inspection
  • 1.1 Documentation and other relevant reports are read and clarified, as required, to confirm inspection requirements
  • 1.2 Individual responsibilities required to complete roll-by inspection are agreed with relevant personnel, as required
  • 1.3 Hazards are identified, risks are assessed and risk control measures are implemented
  • 1.4 Position is taken for roll-by inspection at planned time to ensure complete observation without personal risk
  • 1.5 Conditions are assessed and necessary actions are taken to ensure roll-by inspection is effective
2 Conduct a roll-by inspection of a moving train
  • 2.1 Train identification and status is confirmed
  • 2.2 Train hazards are identified, risks are assessed and risk control measures are implemented
  • 2.3 Condition of rolling stock and load are systematically observed as train passes and specific faults are identified and noted
  • 2.4 Communication is maintained with relevant personnel to ensure safe, efficient and complete roll-by inspection
  • 2.5 Inspection is conducted in accordance with work health and safety (WHS)/occupational health and safety (OHS) workplace policies and procedures to prevent injury and damage
  • 2.6 Faults requiring urgent action are noted and appropriate action is taken to initiate immediate response to minimise risk from continued movement of train
3 Report and action roll-by inspection results
  • 3.1 Reports of inspections are completed to reflect inspection results
  • 3.2 Appropriate personnel are informed of faults or defects requiring rectification
  • 3.3 Records are circulated and filed in accordance with workplace policies and procedures
4 Report on-train roll-by inspection results
  • 4.1 Outcomes of on-train roll-by inspections are transmitted to appropriate personnel
  • 4.2 Records of on-train roll-by inspections are made in accordance with workplace policies and procedures
No information