Unit of competency Outline

Date retreived
22/07/2026 3:26 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Apply shot-crete underground

Apply shot-crete underground

Unit of competency
National Code
RIIUND310D
State Code
WH727
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
2.00
Current Release Date
07/12/2014
State Implementation and Classification
Approved Date
29/05/2014
Field of Education
030303 - Mining Engineering
Original Release Date
29/05/2014
Nominal Hours
60
Description
This unit describes a participant’s skills and knowledge required to apply shot-crete underground in Civil Construction and Metalliferous Mining.This unit is appropriate for those working in operational roles. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and Industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare to apply shot-crete underground
  • 1.1 Access, interpret and apply shot-crete documentation and ensure the work activity is compliant
  • 1.2 Obtain, interpret clarify and confirm work requirements and shift changeover details before proceeding
  • 1.3 Select and wear appropriate personal protective equipment for work activity
  • 1.4 Select appropriate equipment, safety equipment and ground control materials
  • 1.5 Inspect and assess site conditions to determine if scaling is required and take action
  • 1.6 Conduct equipment pre-start checks
  • 1.7 Identify, address and report potential risks, hazards and environmental issues
  • 1.8 Obtain and interpret emergency procedures and be prepared for fire/accident/emergency
  • 1.9 Inspect and assess appropriateness of ground control mechanism
  • 1.10 Use approved dust suppression equipment and/or extraction methods to ensure adequate ventilation
2. Apply shot-crete
  • 2.1 Prepare and clean targeted surface to ensure maximum cohesion of shot-crete
  • 2.2 Erect barriers
  • 2.3 Minimise the creation of gases and personnel exposure to fumes according to safe shot-creting processes
  • 2.4 Select and apply shot-crete utilising appropriate application method according to manufacturer’s guidelines and ground condition
3. Conduct housekeeping activities
  • 3.1 Maintain barriers/signs after shot-creting
  • 3.2 Complete all required documentation clearly, concisely and on time
  • 3.3 Clean equipment, ascertain condition of equipment and ensure safe and efficient operations
  • 3.4 Pass on end of shift information to oncoming shift
No information
No information
Replaces
State Code National Code Title Type
WC370 RIIUND310 Apply shot-crete underground Unit of competency
Replaced By
State Code National Code Title Type
OCX61 RIIUND310E Apply shotcrete underground Unit of competency