Unit of competency Outline
Date retreived
22/07/2026 12:15 PM AWST
22/07/2026 12:15 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Plan and coordinate protection for multiple worksites within limits of a work on track authority
Plan and coordinate protection for multiple worksites within limits of a work on track authority
Unit of competency
National Code
TLIL4069A
TLIL4069A
State Code
WG233
WG233
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
04/11/2014
Field of Education
039907 - Rail Operations
Original Release Date
04/11/2014
Nominal Hours
15
Description
This unit involves the skills and knowledge required to plan and coordinate worksite protection for multiple worksites within the limits of a Work on Track Authority.The track protection requirements may involve long-term planning and consultation with a number of stakeholders.Licensing or certification requirements are not applicable to this unit.
Notes
Elements and Performance Criteria
1 Identify protection requirements for multiple worksites
- 1.1 Nature and complexity of work to be performed within multiple worksites are identified
- 1.2 Worksite safety plan is developed in accordance with rules and procedures
- 1.3 Personnel and other resources required to undertake protection activities are identified according to worksite protection plan
2 Establish protection of multiple worksites
- 2.1 Detailed information on protection arrangements is provided to appropriate personnel and any issues raised are clarified and/or confirmed
- 2.2 Worksite protection plan is maintained to ensure protection is implemented correctly
- 2.3 Communication links with appropriate personnel are maintained
- 2.4 Rail movements through multiple work areas are coordinated
- 2.5 Establishment and removal of worksites is coordinated within Work on Track Authority limits
- 2.6 Worksite protection is deployed and removed in accordance with rules and procedures
- 2.7 Documentation is completed and maintained for worksite protection for the duration of the Work on Track Authority
3 Remove protection arrangements for multiple work groups
- 3.1 Notification of completed works and assurance that track is safe for passage of rail traffic is received from all protection officers in accordance with workplace procedures
- 3.2 Protection arrangements are removed in accordance with workplace procedures
- 3.3 Actions are documented in accordance with workplace procedures
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance.
Worksites may include:
rail corridor
danger zone:
running line
parallel networks (adjacent access providers, shared corridor)
adjacent lines
sidings/yards
platforms/buildings
structures
Terminology will be:
as defined by the applicable track safeworking system and operating procedures
Work may occur:
by day or night, under varied weather conditions and situations
Safety assessment will be:
as defined within the workplace procedures
as defined in the safety assessment for work including:
view - line of sight
direction of approaching rail traffic
speed of approaching rail traffic
safety places
changed local conditions
Network control officer may be:
network controller
train controller
area controller
signaller
Communications may include:
receiving and passing on verbal messages/information
reporting unsafe situations and responding to emergencies
general safety and emergency messages
Communications equipment and systems may include:
hand and audible signals
radios
telephones/mobile phones
signage
Safety clothing and equipment may include:
high visibility clothing
protective footwear
hearing protection
Where applicable, worksite protection equipment may include:
warning devices, whistles and sirens
railway track signals
demarcation barriers
lights, flags and signs
electronic devices
blocking facilities
Information and documents may include:
workplace procedures, policies and work instructions
emergency plan
pre-work briefing
worksite protection plan
worksite permit
Work activity complexity may include:
type of work to be undertaken
hand tools to be used
track vehicles
machinery
multiple worksites
rail traffic within or between worksite
Characteristics of track worksite may include:
location
cuttings and embankments
speed and density of adjacent traffic
parallel networks
electrified network
track circuits
level and pedestrian crossings
limits of worksite
visibility
work affecting track under the control of other access providers
multiple work activities
Types of track protection may include:
track occupancy authority
rail traffic control
planned track possession
blocking protection
Worksite protection plans may include:
defining the limits
identifying safe places
identifying positions for inner/outer handsignaller and lookouts
identifying level and pedestrian crossings
identifying fixed rail infrastructure including:
signals
overhead structures
bridges/tunnels
turn outs
minimum sighting distances
Work on track authority documentation may include:
train notice
work permits
train register book
forms
Multiple work teams may include:
track workers
overhead workers
signalling workers
outside contractors
electrical workers
mechanised plant operators
plant train operators
Stakeholders may include:
protection officers
possession protection officers
work group supervisors
engineers
management
outside contractors
Worksites may include:
rail corridor
danger zone:
running line
parallel networks (adjacent access providers, shared corridor)
adjacent lines
sidings/yards
platforms/buildings
structures
Terminology will be:
as defined by the applicable track safeworking system and operating procedures
Work may occur:
by day or night, under varied weather conditions and situations
Safety assessment will be:
as defined within the workplace procedures
as defined in the safety assessment for work including:
view - line of sight
direction of approaching rail traffic
speed of approaching rail traffic
safety places
changed local conditions
Network control officer may be:
network controller
train controller
area controller
signaller
Communications may include:
receiving and passing on verbal messages/information
reporting unsafe situations and responding to emergencies
general safety and emergency messages
Communications equipment and systems may include:
hand and audible signals
radios
telephones/mobile phones
signage
Safety clothing and equipment may include:
high visibility clothing
protective footwear
hearing protection
Where applicable, worksite protection equipment may include:
warning devices, whistles and sirens
railway track signals
demarcation barriers
lights, flags and signs
electronic devices
blocking facilities
Information and documents may include:
workplace procedures, policies and work instructions
emergency plan
pre-work briefing
worksite protection plan
worksite permit
Work activity complexity may include:
type of work to be undertaken
hand tools to be used
track vehicles
machinery
multiple worksites
rail traffic within or between worksite
Characteristics of track worksite may include:
location
cuttings and embankments
speed and density of adjacent traffic
parallel networks
electrified network
track circuits
level and pedestrian crossings
limits of worksite
visibility
work affecting track under the control of other access providers
multiple work activities
Types of track protection may include:
track occupancy authority
rail traffic control
planned track possession
blocking protection
Worksite protection plans may include:
defining the limits
identifying safe places
identifying positions for inner/outer handsignaller and lookouts
identifying level and pedestrian crossings
identifying fixed rail infrastructure including:
signals
overhead structures
bridges/tunnels
turn outs
minimum sighting distances
Work on track authority documentation may include:
train notice
work permits
train register book
forms
Multiple work teams may include:
track workers
overhead workers
signalling workers
outside contractors
electrical workers
mechanised plant operators
plant train operators
Stakeholders may include:
protection officers
possession protection officers
work group supervisors
engineers
management
outside contractors
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required knowledge and skills, the range statement and the assessment guidelines for this Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria of this unit and include demonstration of applying:
the required knowledge and skills
relevant workplace rules and procedures
Assessment must include exercises which demonstrate competent performance of the following in a range of situations:
analysing nature and complexity of a work program
demonstrating developing a worksite protection plan
explaining plan to stakeholders
managing a worksite plan with multiple worksites
explaining variations to plan that may need to be negotiated
demonstrating fulfilling worksite permits
Context of and specific resources for assessment
Performance is demonstrated consistently over a period of time and in a suitable range of contexts
Resources for assessment include:
a range of relevant exercises and/or other simulated practical and knowledge assessment, and
access to an appropriate range of relevant operational situations in the workplace
In both real and simulated environments, access is required to:
relevant and appropriate materials and equipment, and
applicable documentation including workplace procedures, regulations, codes of practice and operation manuals
Method of assessment
Assessment of this unit must be undertaken by a registered training organisation
Assessment of knowledge must be conducted through appropriate written/oral tests
Practical assessment must occur:
through activities in an appropriately simulated environment, and
in an appropriate range of situations in the workplace
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria of this unit and include demonstration of applying:
the required knowledge and skills
relevant workplace rules and procedures
Assessment must include exercises which demonstrate competent performance of the following in a range of situations:
analysing nature and complexity of a work program
demonstrating developing a worksite protection plan
explaining plan to stakeholders
managing a worksite plan with multiple worksites
explaining variations to plan that may need to be negotiated
demonstrating fulfilling worksite permits
Context of and specific resources for assessment
Performance is demonstrated consistently over a period of time and in a suitable range of contexts
Resources for assessment include:
a range of relevant exercises and/or other simulated practical and knowledge assessment, and
access to an appropriate range of relevant operational situations in the workplace
In both real and simulated environments, access is required to:
relevant and appropriate materials and equipment, and
applicable documentation including workplace procedures, regulations, codes of practice and operation manuals
Method of assessment
Assessment of this unit must be undertaken by a registered training organisation
Assessment of knowledge must be conducted through appropriate written/oral tests
Practical assessment must occur:
through activities in an appropriately simulated environment, and
in an appropriate range of situations in the workplace
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D5233 | TLIL4068A | Plan and coordinate track protection for multiple work groups | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AVI56 | TLIL4069 | Plan and coordinate protection for multiple worksites within limits of a work on track authority | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| S793 | TLI42311 | Certificate IV in Rail Infrastructure | Qualification |
| J807 | TLI50613 | Diploma of Rail Operations Management | Qualification |
| S792 | TLI32711 | Certificate III in Track Protection | Qualification |