Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Solve problems in low voltage electrical network circuits in a very remote community

Solve problems in low voltage electrical network circuits in a very remote community

Unit of competency
National Code
UETDRRC008
State Code
ODN37
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
20/09/2021
State Implementation and Classification
Approved Date
21/12/2021
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
21/12/2021
Nominal Hours
72
Description
This unit involves the skills and knowledge required to solve problems in low voltage (LV) electrical network circuits in a very remote community in the electricity supply industry (ESI).It includes establishing correct operation of single and multi-phase LV electrical network circuits and solving circuit problems as they apply to servicing, fault-finding and installation work function.It also includes safe working practices, issues related to fault protection, power factor and multiple earthed neutral (MEN) systems and the use of voltage, current and resistance measuring devices to provide solutions to LV electrical network circuit problems derived from calculated and measured parameters.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may also apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Prepare to solve problems in LV electrical network circuits
  • 1.1 Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are referred to and confirmed
  • 1.2 Work plan is obtained and confirmed in accordance with workplace requirements
  • 1.3 Materials required for work are determined and obtained in accordance with work plan and workplace requirements
  • 1.4 Plant, tools, equipment, and personal protective equipment (PPE) required for work are determined, obtained and confirmed in working order
  • 1.5 Hazards are identified, risks assessed and control measures identified and applied
  • 1.6 Work is prioritised and sequenced for completion in accordance with work plan and workplace requirements
  • 1.7 Work permits are received and signed in accordance with workplace requirements
  • 1.8 Worksite is prepared in accordance with the work plan and workplace requirements
  • 1.9 Traffic management plan is confirmed as being in place in accordance with workplace requirements
2 Solve problems in LV electrical network circuits
  • 2.1 Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are applied and monitored
  • 2.2 Lifting, climbing, working at heights and the use of plant, tools, equipment and PPE are carried out in accordance with workplace requirements
  • 2.3 Hazard control measures are monitored in accordance with workplace requirements
  • 2.4 Live testing or measuring requirements are determined in accordance with workplace requirements
  • 2.5 Electrical network circuits are confirmed as isolated and proved earthed/short circuited in accordance with workplace requirements
  • 2.6 Operating parameters of the network electrical circuits are verified in accordance with workplace requirements
  • 2.7 Established methodical processes are used to identify electrical network circuit problems from measured and calculated values in accordance with workplace requirements
  • 2.8 Electrical network circuit problems are solved without damage to apparatus or circuits to comply with workplace requirements
  • 2.9 Earthing/short circuiting equipment is removed, permit signed off and electrical network circuits re-energised in accordance with workplace requirements
  • 2.10 Electrical network circuits are tested to determine correct operation in accordance with workplace requirements
  • 2.11 Incidents or unplanned events are responded to in accordance with workplace requirements
3 Complete work and documentation
  • 3.1 Completed work is checked for compliance against the work plan and workplace requirements
  • 3.2 Worksite is rehabilitated, cleaned and made safe in accordance with workplace procedures
  • 3.3 Plant, tools and equipment are cleaned, checked and returned to storage in accordance with workplace requirements
  • 3.4 Surplus materials are returned to storage or disposed of in accordance with workplace requirements
  • 3.5 Incidents or unplanned events are reported in accordance with workplace requirements
  • 3.6 Work records, reports and documentation are completed, and appropriate personnel notified in accordance with workplace requirements
No information
No information
Replaces
State Code National Code Title Type
OBH79 UETTDRIS33 Solve electrical problems in remote community network systems Unit of competency